dear sir,
I saved a visual report from MSP at a location.Now when I updated some
data in MSP , I want same change to be reflected in the visual report already
saved.So when I click on Defer layout update it - it gives a message can't
update the cube.Then it takes to multidimensional connection wizard.I tried
to do it through it but unable to do it. So please tell how it can be done ?
--
Amey B. Vidvans,
Planning Engineer
Vidvans_amey@rediffmail.com
|
|
0
|
|
|
|
Reply
|
Utf
|
11/18/2009 7:20:02 AM |
|
This is a multi-part message in MIME format.
------=_NextPart_000_002A_01CA6846.30346520
Content-Type: text/plain;
charset="Windows-1252"
Content-Transfer-Encoding: quoted-printable
Hi Amey,
Try posting on the microsoft.public.project.server newsgroup (forum). =
Please see FAQ Item: 24. Project Newsgroups. FAQs, companion products =
and other useful Project information can be seen at this web address: =
http://project.mvps.org/faqs.htm=20
Mike Glen
Project MVP
"Amey" <Amey@discussions.microsoft.com> wrote in message =
news:FF4371EC-75F1-4E7A-92B0-F67733ECC8AA@microsoft.com...
dear sir,
I saved a visual report from MSP at a location.Now when I =
updated some=20
data in MSP , I want same change to be reflected in the visual report =
already=20
saved.So when I click on Defer layout update it - it gives a message =
can't=20
update the cube.Then it takes to multidimensional connection wizard.I =
tried=20
to do it through it but unable to do it. So please tell how it can be =
done ?
--=20
Amey B. Vidvans,
Planning Engineer
Vidvans_amey@rediffmail.com
------=_NextPart_000_002A_01CA6846.30346520
Content-Type: text/html;
charset="Windows-1252"
Content-Transfer-Encoding: quoted-printable
<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">
<HTML><HEAD>
<META content=3Dtext/html;charset=3DWindows-1252 =
http-equiv=3DContent-Type>
<META name=3DGENERATOR content=3D"MSHTML 8.00.7600.16444"></HEAD>
<BODY style=3D"PADDING-LEFT: 10px; PADDING-RIGHT: 10px; PADDING-TOP: =
15px"=20
id=3DMailContainerBody leftMargin=3D0 topMargin=3D0 =
CanvasTabStop=3D"true"=20
name=3D"Compose message area">
<DIV><FONT color=3D#008080 face=3D"Comic Sans MS">Hi Amey,</FONT></DIV>
<DIV> </DIV>
<DIV><FONT color=3D#008080 face=3D"Comic Sans MS">Try posting on the=20
microsoft.public.project.server newsgroup (forum). Please see FAQ =
Item:=20
24. Project Newsgroups. FAQs, companion products and other =
useful=20
Project information can be seen at this web address: <A=20
href=3D"http://project.mvps.org/faqs.htm">http://project.mvps.org/faqs.ht=
m</A>=20
</FONT></DIV>
<DIV> </DIV>
<DIV><FONT color=3D#008080 face=3D"Comic Sans MS">Mike Glen<BR>Project=20
MVP</FONT></DIV>
<DIV> </DIV>
<DIV><FONT color=3D#008080 face=3D"Comic Sans MS"></FONT> </DIV>
<BLOCKQUOTE=20
style=3D"BORDER-LEFT: #008080 2px solid; PADDING-LEFT: 5px; =
PADDING-RIGHT: 0px; MARGIN-LEFT: 5px; MARGIN-RIGHT: 0px">
<DIV>"Amey" <<A=20
=
href=3D"mailto:Amey@discussions.microsoft.com">Amey@discussions.microsoft=
..com</A>>=20
wrote in message <A=20
=
href=3D"news:FF4371EC-75F1-4E7A-92B0-F67733ECC8AA@microsoft.com">news:FF4=
371EC-75F1-4E7A-92B0-F67733ECC8AA@microsoft.com</A>...</DIV>dear=20
sir,<BR> I saved a visual report from =
MSP at a=20
location.Now when I updated some <BR>data in MSP , I want same change =
to be=20
reflected in the visual report already <BR>saved.So when I click on =
Defer=20
layout update it - it gives a message can't <BR>update the cube.Then =
it takes=20
to multidimensional connection wizard.I tried <BR>to do it through it =
but=20
unable to do it. So please tell how it can be done ?<BR>-- <BR>Amey B. =
Vidvans,<BR>Planning Engineer<BR><A=20
=
href=3D"mailto:Vidvans_amey@rediffmail.com">Vidvans_amey@rediffmail.com</=
A></BLOCKQUOTE></BODY></HTML>
------=_NextPart_000_002A_01CA6846.30346520--
|
|
0
|
|
|
|
Reply
|
Mike
|
11/18/2009 11:56:39 AM
|
|