SOAP error when connect to project server

  • Follow


I have an installation of Project 2007 Professional w/SP2 and i've been 
trying to connect up to our Project server but i get an error saying that the 
Office SOAP toolkit component is not installed correctly.

I have a mixed office environment, where Project 2007 is the only 2007 
office product i'm using and the rest is office XP SP3.

Has anyone got any ideas on how to solve this issue?
0
Reply Utf 1/21/2010 8:29:01 AM

This is a multi-part message in MIME format.

------=_NextPart_000_0079_01CA9A91.D92F4690
Content-Type: text/plain;
	charset="Windows-1252"
Content-Transfer-Encoding: quoted-printable

Hi Matt,

Try posting on the microsoft.public.project.server newsgroup (forum).  =
Please see FAQ Item: 24. Project Newsgroups.   FAQs, companion products =
and other useful Project information can be seen at this web address: =
http://project.mvps.org/faqs.htm=20

Mike Glen
Project MVP


  "MattSummer" <MattSummer@discussions.microsoft.com> wrote in message =
news:A12DC92F-944A-4C13-8AD2-6EAA190CF7DA@microsoft.com...
  I have an installation of Project 2007 Professional w/SP2 and i've =
been=20
  trying to connect up to our Project server but i get an error saying =
that the=20
  Office SOAP toolkit component is not installed correctly.

  I have a mixed office environment, where Project 2007 is the only 2007 =

  office product i'm using and the rest is office XP SP3.

  Has anyone got any ideas on how to solve this issue?
------=_NextPart_000_0079_01CA9A91.D92F4690
Content-Type: text/html;
	charset="Windows-1252"
Content-Transfer-Encoding: quoted-printable

<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">
<HTML><HEAD>
<META content=3Dtext/html;charset=3DWindows-1252 =
http-equiv=3DContent-Type>
<META name=3DGENERATOR content=3D"MSHTML 8.00.7600.16466"></HEAD>
<BODY style=3D"PADDING-LEFT: 10px; PADDING-RIGHT: 10px; PADDING-TOP: =
15px"=20
id=3DMailContainerBody leftMargin=3D0 topMargin=3D0 =
CanvasTabStop=3D"true"=20
name=3D"Compose message area">
<DIV><FONT face=3D"Comic Sans MS">Hi Matt,</FONT></DIV>
<DIV>&nbsp;</DIV>
<DIV><FONT face=3D"Comic Sans MS">Try posting on the=20
microsoft.public.project.server newsgroup (forum).&nbsp; Please see FAQ =
Item:=20
24. Project Newsgroups.&nbsp;&nbsp; FAQs, companion products and other =
useful=20
Project information can be seen at this web address: <A=20
href=3D"http://project.mvps.org/faqs.htm">http://project.mvps.org/faqs.ht=
m</A>=20
</FONT></DIV>
<DIV>&nbsp;</DIV>
<DIV><FONT face=3D"Comic Sans MS">Mike Glen<BR>Project MVP</FONT></DIV>
<DIV>&nbsp;</DIV>
<DIV><FONT face=3D"Comic Sans MS"></FONT>&nbsp;</DIV>
<BLOCKQUOTE=20
style=3D"BORDER-LEFT: #000000 2px solid; PADDING-LEFT: 5px; =
PADDING-RIGHT: 0px; MARGIN-LEFT: 5px; MARGIN-RIGHT: 0px">
  <DIV>"MattSummer" &lt;<A=20
  =
href=3D"mailto:MattSummer@discussions.microsoft.com">MattSummer@discussio=
ns.microsoft.com</A>&gt;=20
  wrote in message <A=20
  =
href=3D"news:A12DC92F-944A-4C13-8AD2-6EAA190CF7DA@microsoft.com">news:A12=
DC92F-944A-4C13-8AD2-6EAA190CF7DA@microsoft.com</A>...</DIV>I=20
  have an installation of Project 2007 Professional w/SP2 and i've been=20
  <BR>trying to connect up to our Project server but i get an error =
saying that=20
  the <BR>Office SOAP toolkit component is not installed =
correctly.<BR><BR>I=20
  have a mixed office environment, where Project 2007 is the only 2007=20
  <BR>office product i'm using and the rest is office XP SP3.<BR><BR>Has =
anyone=20
  got any ideas on how to solve this issue?</BLOCKQUOTE></BODY></HTML>

------=_NextPart_000_0079_01CA9A91.D92F4690--

0
Reply Mike 1/21/2010 12:04:13 PM


1 Replies
1114 Views

(page loaded in 0.311 seconds)

Similiar Articles:
















7/19/2012 3:47:46 PM


Reply: