Hi,

I have a project with many tasks and the developer has moved on to get the 
most important tasks done  -- because of time.  How do I place previous tasks 
on hold?
That's because based on the project some things should've been done this 
week but instead other tasks have taken priority.

-jp
0
Reply Utf 2/24/2010 12:39:02 AM

A couple of options to try out:

1) Just add dependencies from the higher priority tasks to the lower 
priority tasks.
2) Set task priorities and level your project.
3) Not sure how you're updating your project, but you could open the Gantt 
Chart view and expose the Stop and Resume fields.  Then manually plug dates 
into the Resume fields.

I haven't quite used that approach manually, but I have played with a macro 
that does just that.

If you can't enter dates into the Resume field, check Tools > Options to 
ensure that Splitting Tasks is allowed.


"jp" wrote:

> 
> Hi,
> 
> I have a project with many tasks and the developer has moved on to get the 
> most important tasks done  -- because of time.  How do I place previous tasks 
> on hold?
> That's because based on the project some things should've been done this 
> week but instead other tasks have taken priority.
> 
> -jp
0
Reply Utf 2/24/2010 1:46:01 AM


Hi,

Try this:
Tools
Tracking
Update Project
Reschedule uncompleted work to start after..
OK

HTH

-- 
Jan De Messemaeker
Microsoft Project Most Valuable Professional
+32 495 300 620
For availability check:
http://users.online.be/prom-ade/Calendar.pdf
"jp" <jp@discussions.microsoft.com> wrote in message 
news:BEDA59C5-BA49-4358-837F-5F6B8CFB0E0D@microsoft.com...
>
> Hi,
>
> I have a project with many tasks and the developer has moved on to get the
> most important tasks done  -- because of time.  How do I place previous 
> tasks
> on hold?
> That's because based on the project some things should've been done this
> week but instead other tasks have taken priority.
>
> -jp 


0
Reply Jan 2/24/2010 7:51:24 AM

oh ok.  So there is no way to suspend tasks in MS-Project 2003?

I have to try Andrew's option of exposing the fields he suggested.  I will 
try your suggestion too.  The funny thing about MS-Project is that you can 
always plan it but it rarely follows a "single yellow line" and that's where 
we neeed a button to suspend things.... Thansk Jan, Andrew for your 
suggestions.
;-)

-jp

"Jan De Messemaeker" wrote:

> Hi,
> 
> Try this:
> Tools
> Tracking
> Update Project
> Reschedule uncompleted work to start after..
> OK
> 
> HTH
> 
> -- 
> Jan De Messemaeker
> Microsoft Project Most Valuable Professional
> +32 495 300 620
> For availability check:
> http://users.online.be/prom-ade/Calendar.pdf
> "jp" <jp@discussions.microsoft.com> wrote in message 
> news:BEDA59C5-BA49-4358-837F-5F6B8CFB0E0D@microsoft.com...
> >
> > Hi,
> >
> > I have a project with many tasks and the developer has moved on to get the
> > most important tasks done  -- because of time.  How do I place previous 
> > tasks
> > on hold?
> > That's because based on the project some things should've been done this
> > week but instead other tasks have taken priority.
> >
> > -jp 
> 
> 
> .
> 
0
Reply Utf 2/24/2010 3:46:02 PM

I went to the task and inserted the "Stop" and "Resume" fields.
These tasks were supposed to get started 2/3/10 and did not (now 2/24/10).
I am also having difficulty splitting tasks unless they have at least 1% 
started.  If
it's 0% it won't allow me to do anything with the "Stop" and "Resume" fields.
Can u explain the rules on "Stop" "Resume" fields and what they can and cannot
do?  Many thanks.

-jp

"Andrew Lavinsky" wrote:

> A couple of options to try out:
> 
> 1) Just add dependencies from the higher priority tasks to the lower 
> priority tasks.
> 2) Set task priorities and level your project.
> 3) Not sure how you're updating your project, but you could open the Gantt 
> Chart view and expose the Stop and Resume fields.  Then manually plug dates 
> into the Resume fields.
> 
> I haven't quite used that approach manually, but I have played with a macro 
> that does just that.
> 
> If you can't enter dates into the Resume field, check Tools > Options to 
> ensure that Splitting Tasks is allowed.
> 
> 
> "jp" wrote:
> 
> > 
> > Hi,
> > 
> > I have a project with many tasks and the developer has moved on to get the 
> > most important tasks done  -- because of time.  How do I place previous tasks 
> > on hold?
> > That's because based on the project some things should've been done this 
> > week but instead other tasks have taken priority.
> > 
> > -jp
0
Reply Utf 2/24/2010 4:25:01 PM

I'm probably too old to understand this.
WXhat else that "putting on hold" does the reschedule work button do?
It either delays or SPLITS task as you want.
BTW there is the option "For selected tasks" if you want to limit its 
influence.
HTH

-- 
Jan De Messemaeker
Microsoft Project Most Valuable Professional
+32 495 300 620
For availability check:
http://users.online.be/prom-ade/Calendar.pdf
"jp" <jp@discussions.microsoft.com> wrote in message 
news:28ACFE50-E7BE-4921-B1C4-4160D07CE654@microsoft.com...
>
> oh ok.  So there is no way to suspend tasks in MS-Project 2003?
>
> I have to try Andrew's option of exposing the fields he suggested.  I will
> try your suggestion too.  The funny thing about MS-Project is that you can
> always plan it but it rarely follows a "single yellow line" and that's 
> where
> we neeed a button to suspend things.... Thansk Jan, Andrew for your
> suggestions.
> ;-)
>
> -jp
>
> "Jan De Messemaeker" wrote:
>
>> Hi,
>>
>> Try this:
>> Tools
>> Tracking
>> Update Project
>> Reschedule uncompleted work to start after..
>> OK
>>
>> HTH
>>
>> -- 
>> Jan De Messemaeker
>> Microsoft Project Most Valuable Professional
>> +32 495 300 620
>> For availability check:
>> http://users.online.be/prom-ade/Calendar.pdf
>> "jp" <jp@discussions.microsoft.com> wrote in message
>> news:BEDA59C5-BA49-4358-837F-5F6B8CFB0E0D@microsoft.com...
>> >
>> > Hi,
>> >
>> > I have a project with many tasks and the developer has moved on to get 
>> > the
>> > most important tasks done  -- because of time.  How do I place previous
>> > tasks
>> > on hold?
>> > That's because based on the project some things should've been done 
>> > this
>> > week but instead other tasks have taken priority.
>> >
>> > -jp
>>
>>
>> .
>> 


0
Reply Jan 2/24/2010 6:03:41 PM

This is a multi-part message in MIME format.

------=_NextPart_000_005B_01CAB611.53F820F0
Content-Type: text/plain;
	charset="Windows-1252"
Content-Transfer-Encoding: quoted-printable

Hi jp,

Try, in the Task Usage view, entering zero work between the stop and =
re-start dates.

Mike Glen
Project MVP
See http://tinyurl.com/2xbhc for my free Project Tutorials


  "jp" <jp@discussions.microsoft.com> wrote in message =
news:28ACFE50-E7BE-4921-B1C4-4160D07CE654@microsoft.com...

  oh ok.  So there is no way to suspend tasks in MS-Project 2003?

  I have to try Andrew's option of exposing the fields he suggested.  I =
will=20
  try your suggestion too.  The funny thing about MS-Project is that you =
can=20
  always plan it but it rarely follows a "single yellow line" and that's =
where=20
  we neeed a button to suspend things.... Thansk Jan, Andrew for your=20
  suggestions.
  ;-)

  -jp

  "Jan De Messemaeker" wrote:

  > Hi,
  >=20
  > Try this:
  > Tools
  > Tracking
  > Update Project
  > Reschedule uncompleted work to start after..
  > OK
  >=20
  > HTH
  >=20
  > --=20
  > Jan De Messemaeker
  > Microsoft Project Most Valuable Professional
  > +32 495 300 620
  > For availability check:
  > http://users.online.be/prom-ade/Calendar.pdf
  > "jp" <jp@discussions.microsoft.com> wrote in message=20
  > news:BEDA59C5-BA49-4358-837F-5F6B8CFB0E0D@microsoft.com...
  > >
  > > Hi,
  > >
  > > I have a project with many tasks and the developer has moved on to =
get the
  > > most important tasks done  -- because of time.  How do I place =
previous=20
  > > tasks
  > > on hold?
  > > That's because based on the project some things should've been =
done this
  > > week but instead other tasks have taken priority.
  > >
  > > -jp=20
  >=20
  >=20
  > .
  >
------=_NextPart_000_005B_01CAB611.53F820F0
Content-Type: text/html;
	charset="Windows-1252"
Content-Transfer-Encoding: quoted-printable

<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">
<HTML><HEAD>
<META content=3Dtext/html;charset=3DWindows-1252 =
http-equiv=3DContent-Type>
<META name=3DGENERATOR content=3D"MSHTML 8.00.7600.16490"></HEAD>
<BODY style=3D"PADDING-LEFT: 10px; PADDING-RIGHT: 10px; PADDING-TOP: =
15px"=20
id=3DMailContainerBody leftMargin=3D0 topMargin=3D0 =
CanvasTabStop=3D"true"=20
name=3D"Compose message area">
<DIV><FONT face=3D"Comic Sans MS">Hi jp,</FONT></DIV>
<DIV><FONT face=3D"Comic Sans MS"></FONT>&nbsp;</DIV>
<DIV><FONT face=3D"Comic Sans MS">Try, in the Task Usage =
view,&nbsp;entering zero=20
work between the stop and re-start dates.</FONT></DIV>
<DIV><FONT face=3D"Comic Sans MS"></FONT>&nbsp;</DIV>
<DIV><FONT face=3D"Comic Sans MS">Mike Glen</FONT></DIV>
<DIV><FONT face=3D"Comic Sans MS">Project MVP</FONT></DIV>
<DIV><FONT face=3D"Comic Sans MS">See <A=20
href=3D"http://tinyurl.com/2xbhc">http://tinyurl.com/2xbhc</A> for my =
free Project=20
Tutorials</FONT></DIV>
<DIV><FONT face=3D"Comic Sans MS"></FONT>&nbsp;</DIV>
<DIV><FONT face=3D"Comic Sans MS"></FONT>&nbsp;</DIV>
<BLOCKQUOTE=20
style=3D"BORDER-LEFT: #000000 2px solid; PADDING-LEFT: 5px; =
PADDING-RIGHT: 0px; MARGIN-LEFT: 5px; MARGIN-RIGHT: 0px">
  <DIV>"jp" &lt;<A=20
  =
href=3D"mailto:jp@discussions.microsoft.com">jp@discussions.microsoft.com=
</A>&gt;=20
  wrote in message <A=20
  =
href=3D"news:28ACFE50-E7BE-4921-B1C4-4160D07CE654@microsoft.com">news:28A=
CFE50-E7BE-4921-B1C4-4160D07CE654@microsoft.com</A>...</DIV><BR>oh=20
  ok.&nbsp; So there is no way to suspend tasks in MS-Project =
2003?<BR><BR>I=20
  have to try Andrew's option of exposing the fields he suggested.&nbsp; =
I will=20
  <BR>try your suggestion too.&nbsp; The funny thing about MS-Project is =
that=20
  you can <BR>always plan it but it rarely follows a "single yellow =
line" and=20
  that's where <BR>we neeed a button to suspend things.... Thansk Jan, =
Andrew=20
  for your <BR>suggestions.<BR>;-)<BR><BR>-jp<BR><BR>"Jan De =
Messemaeker"=20
  wrote:<BR><BR>&gt; Hi,<BR>&gt; <BR>&gt; Try this:<BR>&gt; =
Tools<BR>&gt;=20
  Tracking<BR>&gt; Update Project<BR>&gt; Reschedule uncompleted work to =
start=20
  after..<BR>&gt; OK<BR>&gt; <BR>&gt; HTH<BR>&gt; <BR>&gt; -- <BR>&gt; =
Jan De=20
  Messemaeker<BR>&gt; Microsoft Project Most Valuable =
Professional<BR>&gt; +32=20
  495 300 620<BR>&gt; For availability check:<BR>&gt; <A=20
  =
href=3D"http://users.online.be/prom-ade/Calendar.pdf">http://users.online=
..be/prom-ade/Calendar.pdf</A><BR>&gt;=20
  "jp" &lt;<A=20
  =
href=3D"mailto:jp@discussions.microsoft.com">jp@discussions.microsoft.com=
</A>&gt;=20
  wrote in message <BR>&gt; <A=20
  =
href=3D"news:BEDA59C5-BA49-4358-837F-5F6B8CFB0E0D@microsoft.com">news:BED=
A59C5-BA49-4358-837F-5F6B8CFB0E0D@microsoft.com</A>...<BR>&gt;=20
  &gt;<BR>&gt; &gt; Hi,<BR>&gt; &gt;<BR>&gt; &gt; I have a project with =
many=20
  tasks and the developer has moved on to get the<BR>&gt; &gt; most =
important=20
  tasks done&nbsp; -- because of time.&nbsp; How do I place previous =
<BR>&gt;=20
  &gt; tasks<BR>&gt; &gt; on hold?<BR>&gt; &gt; That's because based on =
the=20
  project some things should've been done this<BR>&gt; &gt; week but =
instead=20
  other tasks have taken priority.<BR>&gt; &gt;<BR>&gt; &gt; -jp =
<BR>&gt;=20
  <BR>&gt; <BR>&gt; .<BR>&gt;</BLOCKQUOTE></BODY></HTML>

------=_NextPart_000_005B_01CAB611.53F820F0--

0
Reply Mike 2/25/2010 11:54:47 AM

Not sure what you mean by "suspend tasks."  Remember that project is not 
designed to reflect dates you determine elsewhere but rather compute the 
schedule that you ought to be working.  In aviation they say you plan your 
flight then fly your plan. Project works on the assumption that that is the 
way you'll work on your projects as well - that you'll plan when tasks ought 
to be done using Project and mandate that your resources work according to 
the schedule you've developed.  If you were supposed to do a task last week 
but didn't follow the plan and do it, all you can do is reschedule to the 
earliest date you can do it - hence the advice to use the "reschedule 
uncompleted work" tool.  "Suspend" seems to imply that work will be done on 
the task at some indeterminate date in the future but if that's the way 
you're actually going to work scheduling is pretty much meaningless and all 
you have is a to-do list.
-- 
Steve House
MS Project Trainer & Consultant



"jp" <jp@discussions.microsoft.com> wrote in message 
news:28ACFE50-E7BE-4921-B1C4-4160D07CE654@microsoft.com...
>
> oh ok.  So there is no way to suspend tasks in MS-Project 2003?
>
> I have to try Andrew's option of exposing the fields he suggested.  I will
> try your suggestion too.  The funny thing about MS-Project is that you can
> always plan it but it rarely follows a "single yellow line" and that's 
> where
> we neeed a button to suspend things.... Thansk Jan, Andrew for your
> suggestions.
> ;-)
>
> -jp
>
> "Jan De Messemaeker" wrote:
>
>> Hi,
>>
>> Try this:
>> Tools
>> Tracking
>> Update Project
>> Reschedule uncompleted work to start after..
>> OK
>>
>> HTH
>>
>> -- 
>> Jan De Messemaeker
>> Microsoft Project Most Valuable Professional
>> +32 495 300 620
>> For availability check:
>> http://users.online.be/prom-ade/Calendar.pdf
>> "jp" <jp@discussions.microsoft.com> wrote in message
>> news:BEDA59C5-BA49-4358-837F-5F6B8CFB0E0D@microsoft.com...
>> >
>> > Hi,
>> >
>> > I have a project with many tasks and the developer has moved on to get 
>> > the
>> > most important tasks done  -- because of time.  How do I place previous
>> > tasks
>> > on hold?
>> > That's because based on the project some things should've been done 
>> > this
>> > week but instead other tasks have taken priority.
>> >
>> > -jp
>>
>>
>> .
>> 

0
Reply Steve 2/25/2010 12:14:21 PM

If the task was supposed to start on the 3rd but nothing has been done so 
far, why do you want to leave any of it showing on the 3rd?  You don't have 
a time machine that would let you go back and do some of that work on its 
originally scheduled date, do you?  The earliest you can actually do any 
work on it now is swometime in the the future, hence rescheduling it to 
start after the date you think you'll be able to get back to it is the only 
logical thing to do.  Splitting would mean you got some of the work done but 
stood down before it was completed.  The work that was done stays on the 
days you did it and the balance of the task needs to move to reschedule for 
the date you'll get back to it.
-- 
Steve House
MS Project Trainer & Consultant



"jp" <jp@discussions.microsoft.com> wrote in message 
news:01BD021B-C796-49C3-A90F-0679B5254318@microsoft.com...
>
> I went to the task and inserted the "Stop" and "Resume" fields.
> These tasks were supposed to get started 2/3/10 and did not (now 2/24/10).
> I am also having difficulty splitting tasks unless they have at least 1%
> started.  If
> it's 0% it won't allow me to do anything with the "Stop" and "Resume" 
> fields.
> Can u explain the rules on "Stop" "Resume" fields and what they can and 
> cannot
> do?  Many thanks.
>
> -jp
>
> "Andrew Lavinsky" wrote:
>
>> A couple of options to try out:
>>
>> 1) Just add dependencies from the higher priority tasks to the lower
>> priority tasks.
>> 2) Set task priorities and level your project.
>> 3) Not sure how you're updating your project, but you could open the 
>> Gantt
>> Chart view and expose the Stop and Resume fields.  Then manually plug 
>> dates
>> into the Resume fields.
>>
>> I haven't quite used that approach manually, but I have played with a 
>> macro
>> that does just that.
>>
>> If you can't enter dates into the Resume field, check Tools > Options to
>> ensure that Splitting Tasks is allowed.
>>
>>
>> "jp" wrote:
>>
>> >
>> > Hi,
>> >
>> > I have a project with many tasks and the developer has moved on to get 
>> > the
>> > most important tasks done  -- because of time.  How do I place previous 
>> > tasks
>> > on hold?
>> > That's because based on the project some things should've been done 
>> > this
>> > week but instead other tasks have taken priority.
>> >
>> > -jp 

0
Reply Steve 2/25/2010 5:15:33 PM

Thanks Steve,

So is rescheuduling simply changing the "Start" date of the task or is there 
some
other elaborate way of doing it?  

-JP

"Steve House" wrote:

> If the task was supposed to start on the 3rd but nothing has been done so 
> far, why do you want to leave any of it showing on the 3rd?  You don't have 
> a time machine that would let you go back and do some of that work on its 
> originally scheduled date, do you?  The earliest you can actually do any 
> work on it now is swometime in the the future, hence rescheduling it to 
> start after the date you think you'll be able to get back to it is the only 
> logical thing to do.  Splitting would mean you got some of the work done but 
> stood down before it was completed.  The work that was done stays on the 
> days you did it and the balance of the task needs to move to reschedule for 
> the date you'll get back to it.
> -- 
> Steve House
> MS Project Trainer & Consultant
> 
> 
> 
> "jp" <jp@discussions.microsoft.com> wrote in message 
> news:01BD021B-C796-49C3-A90F-0679B5254318@microsoft.com...
> >
> > I went to the task and inserted the "Stop" and "Resume" fields.
> > These tasks were supposed to get started 2/3/10 and did not (now 2/24/10).
> > I am also having difficulty splitting tasks unless they have at least 1%
> > started.  If
> > it's 0% it won't allow me to do anything with the "Stop" and "Resume" 
> > fields.
> > Can u explain the rules on "Stop" "Resume" fields and what they can and 
> > cannot
> > do?  Many thanks.
> >
> > -jp
> >
> > "Andrew Lavinsky" wrote:
> >
> >> A couple of options to try out:
> >>
> >> 1) Just add dependencies from the higher priority tasks to the lower
> >> priority tasks.
> >> 2) Set task priorities and level your project.
> >> 3) Not sure how you're updating your project, but you could open the 
> >> Gantt
> >> Chart view and expose the Stop and Resume fields.  Then manually plug 
> >> dates
> >> into the Resume fields.
> >>
> >> I haven't quite used that approach manually, but I have played with a 
> >> macro
> >> that does just that.
> >>
> >> If you can't enter dates into the Resume field, check Tools > Options to
> >> ensure that Splitting Tasks is allowed.
> >>
> >>
> >> "jp" wrote:
> >>
> >> >
> >> > Hi,
> >> >
> >> > I have a project with many tasks and the developer has moved on to get 
> >> > the
> >> > most important tasks done  -- because of time.  How do I place previous 
> >> > tasks
> >> > on hold?
> >> > That's because based on the project some things should've been done 
> >> > this
> >> > week but instead other tasks have taken priority.
> >> >
> >> > -jp 
> 
> .
> 
0
Reply Utf 2/26/2010 3:52:01 PM

Hi Jan,

Thank you for your reply.  Is the reschedule button the one labeled 
"Reschedule work"?  I have highlighted the task and click on the "Reschedule 
work" and it changed the start date.  Is it the same as if I had done it 
manually (enter the start date based on my logic?).  Thank you Jan.

-JP

"Jan De Messemaeker" wrote:

> I'm probably too old to understand this.
> WXhat else that "putting on hold" does the reschedule work button do?
> It either delays or SPLITS task as you want.
> BTW there is the option "For selected tasks" if you want to limit its 
> influence.
> HTH
> 
> -- 
> Jan De Messemaeker
> Microsoft Project Most Valuable Professional
> +32 495 300 620
> For availability check:
> http://users.online.be/prom-ade/Calendar.pdf
> "jp" <jp@discussions.microsoft.com> wrote in message 
> news:28ACFE50-E7BE-4921-B1C4-4160D07CE654@microsoft.com...
> >
> > oh ok.  So there is no way to suspend tasks in MS-Project 2003?
> >
> > I have to try Andrew's option of exposing the fields he suggested.  I will
> > try your suggestion too.  The funny thing about MS-Project is that you can
> > always plan it but it rarely follows a "single yellow line" and that's 
> > where
> > we neeed a button to suspend things.... Thansk Jan, Andrew for your
> > suggestions.
> > ;-)
> >
> > -jp
> >
> > "Jan De Messemaeker" wrote:
> >
> >> Hi,
> >>
> >> Try this:
> >> Tools
> >> Tracking
> >> Update Project
> >> Reschedule uncompleted work to start after..
> >> OK
> >>
> >> HTH
> >>
> >> -- 
> >> Jan De Messemaeker
> >> Microsoft Project Most Valuable Professional
> >> +32 495 300 620
> >> For availability check:
> >> http://users.online.be/prom-ade/Calendar.pdf
> >> "jp" <jp@discussions.microsoft.com> wrote in message
> >> news:BEDA59C5-BA49-4358-837F-5F6B8CFB0E0D@microsoft.com...
> >> >
> >> > Hi,
> >> >
> >> > I have a project with many tasks and the developer has moved on to get 
> >> > the
> >> > most important tasks done  -- because of time.  How do I place previous
> >> > tasks
> >> > on hold?
> >> > That's because based on the project some things should've been done 
> >> > this
> >> > week but instead other tasks have taken priority.
> >> >
> >> > -jp
> >>
> >>
> >> .
> >> 
> 
> 
> .
> 
0
Reply Utf 2/26/2010 3:56:01 PM

Hi Mike,

Sorry, could you repeat that?
I went to the "Task View" screen and inserted the "Stop" and "Resume" columns.
I could not find the "Re-start" field.  Next, where does the zero go again?  
Is it in 
the "Details" or....Thanks Mike

-jp

"Mike Glen" wrote:

> Hi jp,
> 
> Try, in the Task Usage view, entering zero work between the stop and
> re-start dates.
> 
> Mike Glen
> Project MVP
> See http://tinyurl.com/2xbhc for my free Project Tutorials
> 
> 
>   "jp" <jp@discussions.microsoft.com> wrote in message
> news:28ACFE50-E7BE-4921-B1C4-4160D07CE654@microsoft.com...
> 
>   oh ok.  So there is no way to suspend tasks in MS-Project 2003?
> 
>   I have to try Andrew's option of exposing the fields he suggested.  I
> will
>   try your suggestion too.  The funny thing about MS-Project is that you
> can
>   always plan it but it rarely follows a "single yellow line" and that's
> where
>   we neeed a button to suspend things.... Thansk Jan, Andrew for your
>   suggestions.
>   ;-)
> 
>   -jp
> 
>   "Jan De Messemaeker" wrote:
> 
>   > Hi,
>   >
>   > Try this:
>   > Tools
>   > Tracking
>   > Update Project
>   > Reschedule uncompleted work to start after..
>   > OK
>   >
>   > HTH
>   >
>   > --
>   > Jan De Messemaeker
>   > Microsoft Project Most Valuable Professional
>   > +32 495 300 620
>   > For availability check:
>   > http://users.online.be/prom-ade/Calendar.pdf
>   > "jp" <jp@discussions.microsoft.com> wrote in message
>   > news:BEDA59C5-BA49-4358-837F-5F6B8CFB0E0D@microsoft.com...
>   > >
>   > > Hi,
>   > >
>   > > I have a project with many tasks and the developer has moved on to
> get the
>   > > most important tasks done  -- because of time.  How do I place
> previous
>   > > tasks
>   > > on hold?
>   > > That's because based on the project some things should've been done
> this
>   > > week but instead other tasks have taken priority.
>   > >
>   > > -jp
>   >
>   >
>   > .
>   >
> 
0
Reply Utf 2/26/2010 4:02:01 PM

Steve,

Thank you.  I understand exactly what you mean.  All I can say is, some 
projects
are crazy....

;-(
-jp

"Steve House" wrote:

> Not sure what you mean by "suspend tasks."  Remember that project is not 
> designed to reflect dates you determine elsewhere but rather compute the 
> schedule that you ought to be working.  In aviation they say you plan your 
> flight then fly your plan. Project works on the assumption that that is the 
> way you'll work on your projects as well - that you'll plan when tasks ought 
> to be done using Project and mandate that your resources work according to 
> the schedule you've developed.  If you were supposed to do a task last week 
> but didn't follow the plan and do it, all you can do is reschedule to the 
> earliest date you can do it - hence the advice to use the "reschedule 
> uncompleted work" tool.  "Suspend" seems to imply that work will be done on 
> the task at some indeterminate date in the future but if that's the way 
> you're actually going to work scheduling is pretty much meaningless and all 
> you have is a to-do list.
> -- 
> Steve House
> MS Project Trainer & Consultant
> 
> 
> 
> "jp" <jp@discussions.microsoft.com> wrote in message 
> news:28ACFE50-E7BE-4921-B1C4-4160D07CE654@microsoft.com...
> >
> > oh ok.  So there is no way to suspend tasks in MS-Project 2003?
> >
> > I have to try Andrew's option of exposing the fields he suggested.  I will
> > try your suggestion too.  The funny thing about MS-Project is that you can
> > always plan it but it rarely follows a "single yellow line" and that's 
> > where
> > we neeed a button to suspend things.... Thansk Jan, Andrew for your
> > suggestions.
> > ;-)
> >
> > -jp
> >
> > "Jan De Messemaeker" wrote:
> >
> >> Hi,
> >>
> >> Try this:
> >> Tools
> >> Tracking
> >> Update Project
> >> Reschedule uncompleted work to start after..
> >> OK
> >>
> >> HTH
> >>
> >> -- 
> >> Jan De Messemaeker
> >> Microsoft Project Most Valuable Professional
> >> +32 495 300 620
> >> For availability check:
> >> http://users.online.be/prom-ade/Calendar.pdf
> >> "jp" <jp@discussions.microsoft.com> wrote in message
> >> news:BEDA59C5-BA49-4358-837F-5F6B8CFB0E0D@microsoft.com...
> >> >
> >> > Hi,
> >> >
> >> > I have a project with many tasks and the developer has moved on to get 
> >> > the
> >> > most important tasks done  -- because of time.  How do I place previous
> >> > tasks
> >> > on hold?
> >> > That's because based on the project some things should've been done 
> >> > this
> >> > week but instead other tasks have taken priority.
> >> >
> >> > -jp
> >>
> >>
> >> .
> >> 
> 
> .
> 
0
Reply Utf 2/26/2010 4:03:01 PM

This is a multi-part message in MIME format.

------=_NextPart_000_0084_01CAB6FE.59BF5420
Content-Type: text/plain;
	charset="Windows-1252"
Content-Transfer-Encoding: quoted-printable

I referred to the Task Usage view.

Mike Glen
Project MVP
See http://tinyurl.com/2xbhc for my free Project Tutorials


  "jp" <jp@discussions.microsoft.com> wrote in message =
news:6E02491D-BA39-48FE-A0F0-AAB59825FCA8@microsoft.com...

  Hi Mike,

  Sorry, could you repeat that?
  I went to the "Task View" screen and inserted the "Stop" and "Resume" =
columns.
  I could not find the "Re-start" field.  Next, where does the zero go =
again? =20
  Is it in=20
  the "Details" or....Thanks Mike

  -jp

  "Mike Glen" wrote:

  > Hi jp,
  >=20
  > Try, in the Task Usage view, entering zero work between the stop and
  > re-start dates.
  >=20
  > Mike Glen
  > Project MVP
  > See http://tinyurl.com/2xbhc for my free Project Tutorials
  >=20
  >=20
  >   "jp" <jp@discussions.microsoft.com> wrote in message
  > news:28ACFE50-E7BE-4921-B1C4-4160D07CE654@microsoft.com...
  >=20
  >   oh ok.  So there is no way to suspend tasks in MS-Project 2003?
  >=20
  >   I have to try Andrew's option of exposing the fields he suggested. =
 I
  > will
  >   try your suggestion too.  The funny thing about MS-Project is that =
you
  > can
  >   always plan it but it rarely follows a "single yellow line" and =
that's
  > where
  >   we neeed a button to suspend things.... Thansk Jan, Andrew for =
your
  >   suggestions.
  >   ;-)
  >=20
  >   -jp
  >=20
  >   "Jan De Messemaeker" wrote:
  >=20
  >   > Hi,
  >   >
  >   > Try this:
  >   > Tools
  >   > Tracking
  >   > Update Project
  >   > Reschedule uncompleted work to start after..
  >   > OK
  >   >
  >   > HTH
  >   >
  >   > --
  >   > Jan De Messemaeker
  >   > Microsoft Project Most Valuable Professional
  >   > +32 495 300 620
  >   > For availability check:
  >   > http://users.online.be/prom-ade/Calendar.pdf
  >   > "jp" <jp@discussions.microsoft.com> wrote in message
  >   > news:BEDA59C5-BA49-4358-837F-5F6B8CFB0E0D@microsoft.com...
  >   > >
  >   > > Hi,
  >   > >
  >   > > I have a project with many tasks and the developer has moved =
on to
  > get the
  >   > > most important tasks done  -- because of time.  How do I place
  > previous
  >   > > tasks
  >   > > on hold?
  >   > > That's because based on the project some things should've been =
done
  > this
  >   > > week but instead other tasks have taken priority.
  >   > >
  >   > > -jp
  >   >
  >   >
  >   > .
  >   >
  >
------=_NextPart_000_0084_01CAB6FE.59BF5420
Content-Type: text/html;
	charset="Windows-1252"
Content-Transfer-Encoding: quoted-printable

<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">
<HTML><HEAD>
<META content=3Dtext/html;charset=3DWindows-1252 =
http-equiv=3DContent-Type>
<META name=3DGENERATOR content=3D"MSHTML 8.00.7600.16490"></HEAD>
<BODY style=3D"PADDING-LEFT: 10px; PADDING-RIGHT: 10px; PADDING-TOP: =
15px"=20
id=3DMailContainerBody leftMargin=3D0 topMargin=3D0 =
CanvasTabStop=3D"true"=20
name=3D"Compose message area">
<DIV><FONT face=3D"Comic Sans MS">I referred to the Task Usage =
view.</FONT></DIV>
<DIV><FONT face=3D"Comic Sans MS"></FONT>&nbsp;</DIV>
<DIV><FONT face=3D"Comic Sans MS">Mike Glen</FONT></DIV>
<DIV><FONT face=3D"Comic Sans MS">Project MVP</FONT></DIV>
<DIV><FONT face=3D"Comic Sans MS">See <A=20
title=3D"http://tinyurl.com/2xbhc&#10;CTRL + Click to follow link"=20
href=3D"http://tinyurl.com/2xbhc">http://tinyurl.com/2xbhc</A> for my =
free Project=20
Tutorials</FONT></DIV>
<DIV><FONT face=3D"Comic Sans MS"></FONT>&nbsp;</DIV>
<DIV><FONT face=3D"Comic Sans MS"></FONT>&nbsp;</DIV>
<BLOCKQUOTE=20
style=3D"BORDER-LEFT: #000000 2px solid; PADDING-LEFT: 5px; =
PADDING-RIGHT: 0px; MARGIN-LEFT: 5px; MARGIN-RIGHT: 0px">
  <DIV>"jp" &lt;<A=20
  title=3D"mailto:jp@discussions.microsoft.com&#10;CTRL + Click to =
follow link"=20
  =
href=3D"mailto:jp@discussions.microsoft.com">jp@discussions.microsoft.com=
</A>&gt;=20
  wrote in message <A=20
  =
href=3D"news:6E02491D-BA39-48FE-A0F0-AAB59825FCA8@microsoft.com">news:6E0=
2491D-BA39-48FE-A0F0-AAB59825FCA8@microsoft.com</A>...</DIV><BR>Hi=20
  Mike,<BR><BR>Sorry, could you repeat that?<BR>I went to the "Task =
View" screen=20
  and inserted the "Stop" and "Resume" columns.<BR>I could not find the=20
  "Re-start" field.&nbsp; Next, where does the zero go again?&nbsp; =
<BR>Is it in=20
  <BR>the "Details" or....Thanks Mike<BR><BR>-jp<BR><BR>"Mike Glen"=20
  wrote:<BR><BR>&gt; Hi jp,<BR>&gt; <BR>&gt; Try, in the Task Usage =
view,=20
  entering zero work between the stop and<BR>&gt; re-start =
dates.<BR>&gt;=20
  <BR>&gt; Mike Glen<BR>&gt; Project MVP<BR>&gt; See <A=20
  href=3D"http://tinyurl.com/2xbhc">http://tinyurl.com/2xbhc</A> for my =
free=20
  Project Tutorials<BR>&gt; <BR>&gt; <BR>&gt;&nbsp;&nbsp; "jp" &lt;<A=20
  =
href=3D"mailto:jp@discussions.microsoft.com">jp@discussions.microsoft.com=
</A>&gt;=20
  wrote in message<BR>&gt; <A=20
  =
href=3D"news:28ACFE50-E7BE-4921-B1C4-4160D07CE654@microsoft.com">news:28A=
CFE50-E7BE-4921-B1C4-4160D07CE654@microsoft.com</A>...<BR>&gt;=20
  <BR>&gt;&nbsp;&nbsp; oh ok.&nbsp; So there is no way to suspend tasks =
in=20
  MS-Project 2003?<BR>&gt; <BR>&gt;&nbsp;&nbsp; I have to try Andrew's =
option of=20
  exposing the fields he suggested.&nbsp; I<BR>&gt; =
will<BR>&gt;&nbsp;&nbsp; try=20
  your suggestion too.&nbsp; The funny thing about MS-Project is that=20
  you<BR>&gt; can<BR>&gt;&nbsp;&nbsp; always plan it but it rarely =
follows a=20
  "single yellow line" and that's<BR>&gt; where<BR>&gt;&nbsp;&nbsp; we =
neeed a=20
  button to suspend things.... Thansk Jan, Andrew for =
your<BR>&gt;&nbsp;&nbsp;=20
  suggestions.<BR>&gt;&nbsp;&nbsp; ;-)<BR>&gt; <BR>&gt;&nbsp;&nbsp; =
-jp<BR>&gt;=20
  <BR>&gt;&nbsp;&nbsp; "Jan De Messemaeker" wrote:<BR>&gt; =
<BR>&gt;&nbsp;&nbsp;=20
  &gt; Hi,<BR>&gt;&nbsp;&nbsp; &gt;<BR>&gt;&nbsp;&nbsp; &gt; Try=20
  this:<BR>&gt;&nbsp;&nbsp; &gt; Tools<BR>&gt;&nbsp;&nbsp; &gt;=20
  Tracking<BR>&gt;&nbsp;&nbsp; &gt; Update Project<BR>&gt;&nbsp;&nbsp; =
&gt;=20
  Reschedule uncompleted work to start after..<BR>&gt;&nbsp;&nbsp; &gt;=20
  OK<BR>&gt;&nbsp;&nbsp; &gt;<BR>&gt;&nbsp;&nbsp; &gt; =
HTH<BR>&gt;&nbsp;&nbsp;=20
  &gt;<BR>&gt;&nbsp;&nbsp; &gt; --<BR>&gt;&nbsp;&nbsp; &gt; Jan De=20
  Messemaeker<BR>&gt;&nbsp;&nbsp; &gt; Microsoft Project Most Valuable=20
  Professional<BR>&gt;&nbsp;&nbsp; &gt; +32 495 300 =
620<BR>&gt;&nbsp;&nbsp; &gt;=20
  For availability check:<BR>&gt;&nbsp;&nbsp; &gt; <A=20
  =
href=3D"http://users.online.be/prom-ade/Calendar.pdf">http://users.online=
..be/prom-ade/Calendar.pdf</A><BR>&gt;&nbsp;&nbsp;=20
  &gt; "jp" &lt;<A=20
  =
href=3D"mailto:jp@discussions.microsoft.com">jp@discussions.microsoft.com=
</A>&gt;=20
  wrote in message<BR>&gt;&nbsp;&nbsp; &gt; <A=20
  =
href=3D"news:BEDA59C5-BA49-4358-837F-5F6B8CFB0E0D@microsoft.com">news:BED=
A59C5-BA49-4358-837F-5F6B8CFB0E0D@microsoft.com</A>...<BR>&gt;&nbsp;&nbsp=
;=20
  &gt; &gt;<BR>&gt;&nbsp;&nbsp; &gt; &gt; Hi,<BR>&gt;&nbsp;&nbsp; &gt;=20
  &gt;<BR>&gt;&nbsp;&nbsp; &gt; &gt; I have a project with many tasks =
and the=20
  developer has moved on to<BR>&gt; get the<BR>&gt;&nbsp;&nbsp; &gt; =
&gt; most=20
  important tasks done&nbsp; -- because of time.&nbsp; How do I =
place<BR>&gt;=20
  previous<BR>&gt;&nbsp;&nbsp; &gt; &gt; tasks<BR>&gt;&nbsp;&nbsp; &gt; =
&gt; on=20
  hold?<BR>&gt;&nbsp;&nbsp; &gt; &gt; That's because based on the =
project some=20
  things should've been done<BR>&gt; this<BR>&gt;&nbsp;&nbsp; &gt; &gt; =
week but=20
  instead other tasks have taken priority.<BR>&gt;&nbsp;&nbsp; &gt;=20
  &gt;<BR>&gt;&nbsp;&nbsp; &gt; &gt; -jp<BR>&gt;&nbsp;&nbsp;=20
  &gt;<BR>&gt;&nbsp;&nbsp; &gt;<BR>&gt;&nbsp;&nbsp; &gt; =
..<BR>&gt;&nbsp;&nbsp;=20
  &gt;<BR>&gt;</BLOCKQUOTE></BODY></HTML>

------=_NextPart_000_0084_01CAB6FE.59BF5420--

0
Reply Mike 2/26/2010 4:11:27 PM

Reschedule works slightly differently depending on whether the task has any 
work done on it ir not.  If there is no work done, it applies a "Start No 
Earlier Than" constraint to the task of the designated resume work date, 
effectively rescheduling the task to start on that date.  IF there has been 
some work done - say, for example, there's a 5-day duration task that was 
supposed to begin last Monday and it's now late Friday afternoon.  Work was 
done Monday and Tuesday but then stopped, the resource called in sick, so it 
has an Actual Start of Monday, an Actual Duration of 2 days, and a Remaining 
Duration of 3 days.  Reschedule Work (to after today) will split the task at 
Tueday, leaving Monday and Tuesday's work where it is, and shift the 
remaining 3 day out to resume on next Monday, with those 3 days scheduled to 
run on Mon, Tue, and Wed of next week.  For the first task, the one with no 
work at all, the Stop and Resume fields will be empty and the rescheduling 
is accomplished through the constraint, same as manually entering a start 
date.  For the second task, the date marking the end of the work performed 
populates the Stop field and the date the remaining work begins populates 
the Resume field.  In both cases your Baseline (you do have a baseline, 
right?) will retain the originally scheduled start and end dates for 
progress reporting and comparison purposes.
-- 
Steve House
MS Project Trainer & Consultant


"jp" <jp@discussions.microsoft.com> wrote in message 
news:F3F56C33-D9BC-4C00-8E6F-4CD891C258C6@microsoft.com...
>
> Thanks Steve,
>
> So is rescheuduling simply changing the "Start" date of the task or is 
> there
> some
> other elaborate way of doing it?
>
> -JP
>
> "Steve House" wrote:
>
>> If the task was supposed to start on the 3rd but nothing has been done so
>> far, why do you want to leave any of it showing on the 3rd?  You don't 
>> have
>> a time machine that would let you go back and do some of that work on its
>> originally scheduled date, do you?  The earliest you can actually do any
>> work on it now is swometime in the the future, hence rescheduling it to
>> start after the date you think you'll be able to get back to it is the 
>> only
>> logical thing to do.  Splitting would mean you got some of the work done 
>> but
>> stood down before it was completed.  The work that was done stays on the
>> days you did it and the balance of the task needs to move to reschedule 
>> for
>> the date you'll get back to it.
>> -- 
>> Steve House
>> MS Project Trainer & Consultant
>>
>>
>>
>> "jp" <jp@discussions.microsoft.com> wrote in message
>> news:01BD021B-C796-49C3-A90F-0679B5254318@microsoft.com...
>> >
>> > I went to the task and inserted the "Stop" and "Resume" fields.
>> > These tasks were supposed to get started 2/3/10 and did not (now 
>> > 2/24/10).
>> > I am also having difficulty splitting tasks unless they have at least 
>> > 1%
>> > started.  If
>> > it's 0% it won't allow me to do anything with the "Stop" and "Resume"
>> > fields.
>> > Can u explain the rules on "Stop" "Resume" fields and what they can and
>> > cannot
>> > do?  Many thanks.
>> >
>> > -jp
>> >
>> > "Andrew Lavinsky" wrote:
>> >
>> >> A couple of options to try out:
>> >>
>> >> 1) Just add dependencies from the higher priority tasks to the lower
>> >> priority tasks.
>> >> 2) Set task priorities and level your project.
>> >> 3) Not sure how you're updating your project, but you could open the
>> >> Gantt
>> >> Chart view and expose the Stop and Resume fields.  Then manually plug
>> >> dates
>> >> into the Resume fields.
>> >>
>> >> I haven't quite used that approach manually, but I have played with a
>> >> macro
>> >> that does just that.
>> >>
>> >> If you can't enter dates into the Resume field, check Tools > Options 
>> >> to
>> >> ensure that Splitting Tasks is allowed.
>> >>
>> >>
>> >> "jp" wrote:
>> >>
>> >> >
>> >> > Hi,
>> >> >
>> >> > I have a project with many tasks and the developer has moved on to 
>> >> > get
>> >> > the
>> >> > most important tasks done  -- because of time.  How do I place 
>> >> > previous
>> >> > tasks
>> >> > on hold?
>> >> > That's because based on the project some things should've been done
>> >> > this
>> >> > week but instead other tasks have taken priority.
>> >> >
>> >> > -jp
>>
>> .
>> 

0
Reply Steve 2/26/2010 5:55:47 PM

Got it Steve.  Yes, I have a baseline.
;-)
-JP

"Steve House" wrote:

> Reschedule works slightly differently depending on whether the task has any 
> work done on it ir not.  If there is no work done, it applies a "Start No 
> Earlier Than" constraint to the task of the designated resume work date, 
> effectively rescheduling the task to start on that date.  IF there has been 
> some work done - say, for example, there's a 5-day duration task that was 
> supposed to begin last Monday and it's now late Friday afternoon.  Work was 
> done Monday and Tuesday but then stopped, the resource called in sick, so it 
> has an Actual Start of Monday, an Actual Duration of 2 days, and a Remaining 
> Duration of 3 days.  Reschedule Work (to after today) will split the task at 
> Tueday, leaving Monday and Tuesday's work where it is, and shift the 
> remaining 3 day out to resume on next Monday, with those 3 days scheduled to 
> run on Mon, Tue, and Wed of next week.  For the first task, the one with no 
> work at all, the Stop and Resume fields will be empty and the rescheduling 
> is accomplished through the constraint, same as manually entering a start 
> date.  For the second task, the date marking the end of the work performed 
> populates the Stop field and the date the remaining work begins populates 
> the Resume field.  In both cases your Baseline (you do have a baseline, 
> right?) will retain the originally scheduled start and end dates for 
> progress reporting and comparison purposes.
> -- 
> Steve House
> MS Project Trainer & Consultant
> 
> 
> "jp" <jp@discussions.microsoft.com> wrote in message 
> news:F3F56C33-D9BC-4C00-8E6F-4CD891C258C6@microsoft.com...
> >
> > Thanks Steve,
> >
> > So is rescheuduling simply changing the "Start" date of the task or is 
> > there
> > some
> > other elaborate way of doing it?
> >
> > -JP
> >
> > "Steve House" wrote:
> >
> >> If the task was supposed to start on the 3rd but nothing has been done so
> >> far, why do you want to leave any of it showing on the 3rd?  You don't 
> >> have
> >> a time machine that would let you go back and do some of that work on its
> >> originally scheduled date, do you?  The earliest you can actually do any
> >> work on it now is swometime in the the future, hence rescheduling it to
> >> start after the date you think you'll be able to get back to it is the 
> >> only
> >> logical thing to do.  Splitting would mean you got some of the work done 
> >> but
> >> stood down before it was completed.  The work that was done stays on the
> >> days you did it and the balance of the task needs to move to reschedule 
> >> for
> >> the date you'll get back to it.
> >> -- 
> >> Steve House
> >> MS Project Trainer & Consultant
> >>
> >>
> >>
> >> "jp" <jp@discussions.microsoft.com> wrote in message
> >> news:01BD021B-C796-49C3-A90F-0679B5254318@microsoft.com...
> >> >
> >> > I went to the task and inserted the "Stop" and "Resume" fields.
> >> > These tasks were supposed to get started 2/3/10 and did not (now 
> >> > 2/24/10).
> >> > I am also having difficulty splitting tasks unless they have at least 
> >> > 1%
> >> > started.  If
> >> > it's 0% it won't allow me to do anything with the "Stop" and "Resume"
> >> > fields.
> >> > Can u explain the rules on "Stop" "Resume" fields and what they can and
> >> > cannot
> >> > do?  Many thanks.
> >> >
> >> > -jp
> >> >
> >> > "Andrew Lavinsky" wrote:
> >> >
> >> >> A couple of options to try out:
> >> >>
> >> >> 1) Just add dependencies from the higher priority tasks to the lower
> >> >> priority tasks.
> >> >> 2) Set task priorities and level your project.
> >> >> 3) Not sure how you're updating your project, but you could open the
> >> >> Gantt
> >> >> Chart view and expose the Stop and Resume fields.  Then manually plug
> >> >> dates
> >> >> into the Resume fields.
> >> >>
> >> >> I haven't quite used that approach manually, but I have played with a
> >> >> macro
> >> >> that does just that.
> >> >>
> >> >> If you can't enter dates into the Resume field, check Tools > Options 
> >> >> to
> >> >> ensure that Splitting Tasks is allowed.
> >> >>
> >> >>
> >> >> "jp" wrote:
> >> >>
> >> >> >
> >> >> > Hi,
> >> >> >
> >> >> > I have a project with many tasks and the developer has moved on to 
> >> >> > get
> >> >> > the
> >> >> > most important tasks done  -- because of time.  How do I place 
> >> >> > previous
> >> >> > tasks
> >> >> > on hold?
> >> >> > That's because based on the project some things should've been done
> >> >> > this
> >> >> > week but instead other tasks have taken priority.
> >> >> >
> >> >> > -jp
> >>
> >> .
> >> 
> 
> .
> 
0
Reply Utf 2/26/2010 11:42:01 PM

15 Replies
928 Views

(page loaded in 1.119 seconds)


Reply: