I have a project that I work on every week and change the locations but 
re-use the same schedule, my problem is once I change the dates to the next 
week it does not remove the original week, therefore the time scale goes to 
the right and not to the left which is the current new date, I have tried 
everything including unchecking the "fit timescale to end of page" box, works 
a little but not enough, does anyone know how to start the graph on the left 
side and remove the previos dates, I have tried changing the constraint date 
and nothing works, I can send a project be email if you like, email me at 
eric.a.rodriguez@ralphs.com
0
Reply Utf 3/22/2010 5:03:01 PM

This is a multi-part message in MIME format.

------=_NextPart_000_00FD_01CAC9E4.8D497B10
Content-Type: text/plain;
	charset="Windows-1252"
Content-Transfer-Encoding: quoted-printable

Hi Eric,

Welcome to this Microsoft Project newsgroup :)

I would just copy the file, open it up and change the Project start =
date.  This will keep every project in a file of its own.  You could do =
better by creating a template and starting with that each time. Please =
see FAQ Item: 8. New Project Template.   FAQs, companion products and =
other useful  Project information can be seen at this web address: =
http://project.mvps.org/faqs.htm

Hope this helps - please let us know how you get on :-)

Mike Glen
MS Project MVP
See http://tinyurl.com/2xbhc for my free Project Tutorials


=20
  "project schedule help" <project schedule =
help@discussions.microsoft.com> wrote in message =
news:95629CDA-95C4-489C-8CDE-86285302F6C5@microsoft.com...
  I have a project that I work on every week and change the locations =
but=20
  re-use the same schedule, my problem is once I change the dates to the =
next=20
  week it does not remove the original week, therefore the time scale =
goes to=20
  the right and not to the left which is the current new date, I have =
tried=20
  everything including unchecking the "fit timescale to end of page" =
box, works=20
  a little but not enough, does anyone know how to start the graph on =
the left=20
  side and remove the previos dates, I have tried changing the =
constraint date=20
  and nothing works, I can send a project be email if you like, email me =
at=20
  eric.a.rodriguez@ralphs.com
------=_NextPart_000_00FD_01CAC9E4.8D497B10
Content-Type: text/html;
	charset="Windows-1252"
Content-Transfer-Encoding: quoted-printable

<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">
<HTML><HEAD>
<META content=3Dtext/html;charset=3DWindows-1252 =
http-equiv=3DContent-Type>
<META name=3DGENERATOR content=3D"MSHTML 8.00.7600.16490"></HEAD>
<BODY style=3D"PADDING-LEFT: 10px; PADDING-RIGHT: 10px; PADDING-TOP: =
15px"=20
id=3DMailContainerBody leftMargin=3D0 topMargin=3D0 =
CanvasTabStop=3D"true"=20
name=3D"Compose message area">
<DIV><FONT face=3D"Comic Sans MS">Hi Eric,</FONT></DIV>
<DIV>&nbsp;</DIV>
<DIV><FONT face=3D"Comic Sans MS">Welcome to this Microsoft Project =
newsgroup=20
:)</FONT></DIV>
<DIV><FONT face=3D"Comic Sans MS"></FONT>&nbsp;</DIV>
<DIV><FONT face=3D"Comic Sans MS">I would just copy the file, open it up =
and=20
change the Project start date.&nbsp; This will keep every project in a =
file of=20
its own.&nbsp; You could do better </FONT><FONT face=3D"Comic Sans =
MS">by creating=20
a template and starting with that each time. Please see FAQ Item: 8. New =
Project=20
Template.&nbsp;&nbsp; FAQs, companion products and other useful&nbsp; =
Project=20
information can be seen at this web address:=20
http://project.mvps.org/faqs.htm</FONT></DIV>
<DIV>&nbsp;</DIV>
<DIV><FONT face=3D"Comic Sans MS">Hope this helps - please let us know =
how you get=20
on :-)</FONT></DIV>
<DIV>&nbsp;</DIV>
<DIV><FONT face=3D"Comic Sans MS">Mike Glen<BR>MS Project MVP<BR>See <A=20
title=3D"http://tinyurl.com/2xbhc&#10;CTRL + Click to follow link"=20
href=3D"http://tinyurl.com/2xbhc">http://tinyurl.com/2xbhc</A> for my =
free Project=20
Tutorials</FONT></DIV>
<DIV>&nbsp;</DIV>
<DIV><FONT face=3D"Comic Sans MS"><BR>&nbsp;</FONT></DIV>
<BLOCKQUOTE=20
style=3D"BORDER-LEFT: #000000 2px solid; PADDING-LEFT: 5px; =
PADDING-RIGHT: 0px; MARGIN-LEFT: 5px; MARGIN-RIGHT: 0px">
  <DIV>"project schedule help" &lt;project schedule <A=20
  title=3D"mailto:help@discussions.microsoft.com&#10;CTRL + Click to =
follow link"=20
  =
href=3D"mailto:help@discussions.microsoft.com">help@discussions.microsoft=
..com</A>&gt;=20
  wrote in message <A=20
  =
href=3D"news:95629CDA-95C4-489C-8CDE-86285302F6C5@microsoft.com">news:956=
29CDA-95C4-489C-8CDE-86285302F6C5@microsoft.com</A>...</DIV>I=20
  have a project that I work on every week and change the locations but=20
  <BR>re-use the same schedule, my problem is once I change the dates to =
the=20
  next <BR>week it does not remove the original week, therefore the time =
scale=20
  goes to <BR>the right and not to the left which is the current new =
date, I=20
  have tried <BR>everything including unchecking the "fit timescale to =
end of=20
  page" box, works <BR>a little but not enough, does anyone know how to =
start=20
  the graph on the left <BR>side and remove the previos dates, I have =
tried=20
  changing the constraint date <BR>and nothing works, I can send a =
project be=20
  email if you like, email me at <BR><A=20
  =
href=3D"mailto:eric.a.rodriguez@ralphs.com">eric.a.rodriguez@ralphs.com</=
A></BLOCKQUOTE></BODY></HTML>

------=_NextPart_000_00FD_01CAC9E4.8D497B10--

0
Reply Mike 3/22/2010 5:24:39 PM


1 Replies
176 Views

(page loaded in 0.036 seconds)

Similiar Articles:
















7/22/2012 7:33:57 AM


Reply: