Table for user info
Hi,
Does anyone know what table stores all the info about a new user ? I added
a new user using PWA - server setting - add new user link.
Thanks.
|
3/12/2010 12:07:03 PM
|
0
|
=?Utf-8?B?Y3Rk?= <...@discussions.microsoft.com>
|
|
The Project Server Database is unavailable
Hello, This is my first time to post a question in this forum. So I will
apologise in advance if I don't detail my question correctly. I will do my
best. I am very desperate for help.
My Company has Project Server 2003 ERM Solution. I have two users that have
suddenly are getting an error message when they log in to Terminal Server to
run Project 2003 with their Windows Network ID's that "The Project Server
Database is unavailable:" You can't access the Database for one of the
following reasons":
There is a problem with the enterprise global template in the database.
You do not
|
3/12/2010 4:34:01 AM
|
0
|
=?Utf-8?B?VG9tbXk=?= <To...@discussions.microsoft.com>
|
global and 12 folder do not exist
Operational MOPS 2007 system, patched same as described for client:
A user has MSP2007 Pro SP2 patched to Dec CU. THe user's 12\1033\global.mpt
folders and .mpt file do not exist. Only the Cache folder and
11\1033\global.mpt exists in the usual %app data% path.
I found that the MSP2007 Pro client was using a global.mpt file at this
path: C:\Program Files\Microsoft Office\Office12\1033\global.mpt
It is not a shortcut in the client icon, it simply is somehow mapped there.
I created the missing folders manually and copied the global file to the
usual location and then mapped the
|
3/11/2010 10:47:01 PM
|
0
|
=?Utf-8?B?UXVpenplZCBhZ2Fpbg==?= <Quizzedag...@discussions.microsoft.com>
|
PS2007 Hardware vs. Virtualization for Upgrade to x64
We are looking to upgrade our current PS2007 from 32bit to 64bit servers,
mainly to increase performance as we have grown in use to the point where we
are out growing our current processsing capacity. Of course, our IT group
would like to go virtual servers with this, but I've been hearing in forums,
blogs and word of mouth that there are performance problems when running
Project Server in a virtual environment.
Can anyone supply feedback or experiences to indicate whether we should stay
away from virtualization altogether? Is it possible to run a mixed
environment (redirect
|
3/11/2010 8:10:01 PM
|
2
|
=?Utf-8?B?UmljayBGLg==?= <Ri...@discussions.microsoft.com>
|
Is there way to give project ownership to another user in bulk?
All I know right now is to go into PWA, edit the properties of each
project and pick a new owner. Is there a programmatic way to do that
for lots of projects at the same time?
Thanks,
Andy Novak
UNT
|
3/11/2010 6:17:18 PM
|
1
|
"ano...@unt.edu" <ano...@unt.edu>
|
Which is more efficient? Search and Replace or Looping Through All Project Tasks?
During testing, it seems about the same, but generally speaking is it
more efficient or "better" to do a search and replace (within VBA) on
project task contents or loop through each task via VBA and set the
values individually?
Thanks,
Andy Novak
UNT
|
3/11/2010 6:14:54 PM
|
2
|
"ano...@unt.edu" <ano...@unt.edu>
|
List of late tasks across multiple projects
I am looking for the best way to get a list of late tasks for multiple
projects in project server.
I am using Project Serve 2007.
Thanks in advance!
|
3/11/2010 4:48:05 PM
|
1
|
=?Utf-8?B?QnJpYW4gSA==?= <Bri...@discussions.microsoft.com>
|
Difference in behavior or ProjectPercentCompleted and ProjectPercentWorkCompleted?
I'm sure of the implications, but not sure about how these two
attributes actually differ from each other in behavior in project
server. Are they basically the same? When would you use one
column over the other in the reporting database?
Thanks,
Andy Novak
UNT
|
3/11/2010 4:11:40 PM
|
1
|
"ano...@unt.edu" <ano...@unt.edu>
|
Doing a Search and Replace on Status Manager - OK now?
At one time, this could not be done due to bugs. We are at SP2 +
December CU. Is it OK now to perform a Search and Replace on Status
Manager? Is there an issue with that change being applied to Summary
Tasks as well as the Project Summary or should this be done with a VBA
loop ONLY to individual tasks?
In case you are wondering we do lots of reorgs and sometimes a manager
leaves and a replacement will take over projects that once were
managed by the former manager. So, we want the new person to be the
new Status Manager.
Thanks
|
3/11/2010 3:57:13 PM
|
3
|
"ano...@unt.edu" <ano...@unt.edu>
|
Bids and Proposals
There's talk around here of passing around our newest WBS to the various
department heads in order to get their bid hours on a project. Those of us
in IT are looking for a way to prevent this being done with Excel, which is
the current approach being discussed in the PMO. Dale and Gary know that we
opted to not go with the built-in proposal feature, however I think this
latest initiative has some of us re-evaluating that decision.
My question is, if we want the individual department managers to bid hours
on the tasks associated with their departments, and eventually roll those
|
3/11/2010 3:24:03 PM
|
0
|
=?Utf-8?B?S2V2aW4gU2xhbmU=?= <KevinSl...@discussions.microsoft.com>
|
Problems with viewing and creating Data analysing views
Hi
In Project server 2007 we have following costruction:
Domain 1 a project server installation with PWA site...
From Domain 1 we can access the analysing services DB and therefor se and
create Data analysing views.
Domain 2 access with forms users (also testet with adomain user)
From domian 2 we cant access the analysing services, get an error when
trying to view or create data analysing views
site is trusted and access data across domains are enabled.
--
Torben Nielsen
|
3/11/2010 12:49:02 PM
|
0
|
=?Utf-8?B?dG9uaTc2?= <ton...@discussions.microsoft.com>
|
Project server 2003 PWA error in Internet Explorer 8
Hi
when running Project Server 2003 PWA site in Internet Explorer 8 we are
getting an error when i Project Center select a Project-->chose Edit -->
make a change --> then when pressing save the error comes.
we found a solution by downgrading Internet Explorer to version 7.
But is there a setting the user can change in IE8 to prevent this error
(can´t show the error right now, but i think it is comming because of extra
security in IE8 )
--
Torben Nielsen
|
3/11/2010 11:27:01 AM
|
0
|
=?Utf-8?B?dG9uaTc2?= <ton...@discussions.microsoft.com>
|
EV Data in Reporting DB
All,
In MS Project, a user can apply the Task Usage view to a project and
add BCWP and BCWS to the details format. This appears to show these EV
calculations on each task (or even resource) for each time period
shown (day, week, month, etc.).
I'm interested in being able to access that data directly from the
database. In other words, create a SQL statement that will pull the
"timephased" task information, including BCWP and BCWS. I've searched
high and low and can only find these two fields in the MSP_EpmTask
table, which is not timephased. Any suggestions?
|
3/10/2010 9:27:20 PM
|
0
|
Shane <shane.garl...@serco-na.com>
|
Unable to log into project server
The company I work for uses Project Server 2003 and we use Windows
Authentication to log into project. I have a user that was working fine last
week but now he can't log in to project server. He receives an error message.
"You cannot log in to Project Server http://name of our server/projectserver
because you have not identified http://name of our server/projectserver as a
trusted site in Internet Explorer. There is a button "Make Server Trusted"
and when we click on the button it first makes sure we can connect to the
server, which we can. The next message says we can't add
|
3/10/2010 5:28:01 PM
|
1
|
=?Utf-8?B?U2hhcmxlbmU=?= <Sharl...@discussions.microsoft.com>
|
Current date field name
Hi!
We would like to create a field so our Project Managers can easily see what
was supposed to start prior to today. I can't figure out what the "name" for
today's date would be.
Is this close to being right?
IIf([% Complete]=100,"Complete",IIf([start]<today,"Late", "Not Late"))
Thanks for your help!
Stacey
|
3/10/2010 4:46:02 PM
|
2
|
=?Utf-8?B?U3RhY2V5?= <Sta...@discussions.microsoft.com>
|
Data Analysis, where's the date, not day.
PWA 2007 can I get a date out of the data analysis field list? For example,
how about a date for actual work? TIA!
|
3/10/2010 3:56:01 PM
|
0
|
=?Utf-8?B?RGV2b3VyVQ==?= <Devo...@discussions.microsoft.com>
|
How to merge 2 project Workspaces?
Hello,
I know we can create 2 Workspaces while publishing 2 projets (Project Server
2007) and select "Provision the workspace as a subworspace of another
projet", so that the 2nd workspace is "under" the first one.
But I want that the 2 projects use the same and unique Workspace. Is it
possible and how to do that?
Thanks for your help.
|
3/10/2010 1:48:26 PM
|
6
|
"Xiao" <nos...@nospam.com>
|
Repetitive Assignment Update email Notification to all resources i
We are facing this issue on the project server,
The software config of the same is Microsoft Project Server 2007 Version
12.0.0.4518, Project Professional 2007 & SQL 2005 sp3 9.00.4035
When we create a new project and assign task to resources (from project
professional 2007) and later save and publish, the assigned resources get an
email notification of their task and even they can view the same on the PWA
site. Also the project is successfully saved and published on the Project
Server.
However when we open that project again in Project professional 2007 and add
or edit a
|
3/10/2010 12:44:05 PM
|
1
|
=?Utf-8?B?TXVrZXNoIFBhcm1hcg==?= <MukeshPar...@discussions.microsoft.com>
|
Repetitive Assignment Update email Notification to all resources instead of the updated ones.
We are facing this issue on the project server,
The software config of the same is Microsoft Project Server 2007
Version 12.0.0.4518, Project Professional 2007 & SQL 2005 sp3
9.00.4035
When we create a new project and assign task to resources (from
project professional 2007) and later save and publish, the assigned
resources get an email notification of their task and even they can
view the same on the PWA site. Also the project is successfully saved
and published on the Project Server.
However when we open that project again in Project professional 2007
and add or edit any exi
|
3/10/2010 12:33:52 PM
|
0
|
AceMac <mukesh...@gmail.com>
|
how to delete local resources from Build Team
one project in project server 2007 have some local resources which i have
deleted from project . but when i select the project on project center at PWA
.. and click on build team then in build team page those deleted local
resource are still showing with disable checkboxes . how i can delete from
build team of pwa.
|
3/10/2010 8:29:01 AM
|
1
|
=?Utf-8?B?U2Ft?= <...@discussions.microsoft.com>
|
Move Project Server 2007 to new domain
Hi,
We just acquired another company that has a Project 2007 server. We will be
using the ADMT 3.0 tool to help with the domain migration. Everything will
stay the same with the server, just the domain will change. Will using the
ADMT tool work for this?
Thanks
Carlos
|
3/10/2010 3:26:03 AM
|
1
|
=?Utf-8?B?Q2FybG9z?= <Car...@discussions.microsoft.com>
|
Approved task update through PWA, does not update task in Project
My resource has submitted task progress updates through PWA. I review the %
update and approve it. The overall task status in the Project Center does
not change. That specific task which is now say 80% complete remains 0. If
the recourse looks at their "My Task" view, the task sits at 80%.
If I open MS Project (client) and look at the same task, the task has the
newly changed progress to 80%. Any ideas?
|
3/9/2010 10:25:02 PM
|
1
|
=?Utf-8?B?Q2hyaXM=?= <Ch...@discussions.microsoft.com>
|
Project Portfolio Server Change Attributes/Field Names?
Need help of Portfolio gurus, please. In Portfolio 2007, once you open up a
project/proposal from the dashboard, you have several sections on the Project
Info tab. For example, 'Project Objectives', Business Need, Project Scope,
Project Dependencies and so on. Is there a way to relabel or rename these
fields? Alternatively, can we hide some of these sections and add new
sections with the labels that I need? These labels and sections could not be
located in the Attribute definitions, so I am guessing these are reset
somewhere else? Please advise.
|
3/9/2010 9:11:01 PM
|
0
|
=?Utf-8?B?a2FodW5h?= <kah...@discussions.microsoft.com>
|
My Tasks - Hanging Up
I am testing my company's "sandbox" installation of 2007 Project Server.
All of a sudden, my "MY Tasks" is hanging up when I try to open them. I get
nothing.
I started yesterday.
What should I have IT or the Administrator do to trouble shoot it?
|
3/9/2010 8:51:01 PM
|
1
|
=?Utf-8?B?UmVkbmVjayBEYXZpZA==?= <RedneckDa...@discussions.microsoft.com>
|
Proj 2007 install with SharePoint Services 3.0 ?
Can someone clear up the install of Project 2007 and SharePoint Server vs.
Windows SharePoint Services? I know that WSS 3.0 comes with the project
install disk, do I still need to install SharePoint Server also? I have read
as it seems conflicting info one place states install SharePoint first before
Project and another states after.
Thanks,
Norm
|
3/9/2010 7:42:02 PM
|
3
|
=?Utf-8?B?bmticmdz?= <nkb...@discussions.microsoft.com>
|
Sub-Projects and Updating Project Progress (Task Updates)
Hi!
We use Sub-Projects and Master Projects inside our company. There are two
"Project Managers" that handle updating task progress (we do not use
timesheets) and they have about 10 projects each. They currently have to
open each project to Update Task Progress.
Is there a way to do this from the Master Project that will allow them to
only do this once instead of 10 times? I have noticed that through the PWA,
under Approvals, Task Updates, it does show all of the projects, but we have
not been able to successfully get approvals to work from PWA, we have to open
the pro
|
3/9/2010 5:37:01 PM
|
1
|
=?Utf-8?B?U3RhY2V5?= <Sta...@discussions.microsoft.com>
|
Project Server integration with Oracle eBusiness
Hi,
Is it possible to integrate the project server 2007 with oracle ebusiness
solution. is there is any help or tutorial available.
Thanks in advance,
arun
|
3/9/2010 4:56:01 PM
|
0
|
=?Utf-8?B?QXJ1bg==?= <A...@discussions.microsoft.com>
|
Added RBS, rebuild cube, no data
We started without RBS for a month. I added RBS, assigned RBS to resources,
republished all activities. Data analysis shows no data. Help? TIA!
JS
|
3/9/2010 4:55:02 PM
|
6
|
=?Utf-8?B?RGV2b3VyVQ==?= <Devo...@discussions.microsoft.com>
|
Earned Value Report using Data Analysis
All,
I am trying to create an earned value report using Data Analysis
capabilities. The EV numbers will be associated with a charge no and
will be time-phased.
- if a create a task level custom field for the charge number, how do
I get it to show in the dimensions list when configuring the cube?
- what measures would I use to reflect EV (Baseline Cost, Cost, Actual
Cost, Baseline Work, Work, Actual Work) since EV calcs are not in the
Field List?
Is this type of thing possible? Has anyone done this before in a data
analysis view?
|
3/9/2010 4:24:30 PM
|
1
|
Shane <shane.garl...@serco-na.com>
|
Recovering a Corrupt Plan
Hi,
I have a user who cannot access her MS Project plan. We have tried to
restore but the 2 versions we had were also corrupt and unable to open. This
plan is visible in PWA but you cannot open from there as a black box appears
when trying.
Any suggestions?
Thanks
|
3/9/2010 4:15:01 PM
|
1
|
=?Utf-8?B?TUs=?= <...@discussions.microsoft.com>
|
PS2007: Import Timesheet - How to sort timesheet selection dropdow
Hello,
is there a way to sort the dropdown list from where you select the timesheet
period to import into My Tasks page?? This is the dropdown list in the
Import Timesheet screen that appears after clicking on Import Timesheet from
the My Tasks page.. it has all the timesheet periods since we started using
PWA/PS2007 and it is huge... need to either sort it or somehow reduce it...
Thx
|
3/9/2010 3:54:01 PM
|
0
|
=?Utf-8?B?UGVkcm9Kb3Nl?= <PedroJ...@discussions.microsoft.com>
|
Can a non-admin force the check in of one of their projects on Pro
Not sure whether this is a stupid question, but we are using impersonation to
check out a project to a certain user. As the project is checked out in a
different session, when the user is ready to work on the project they will
need to force check in and then re-check out the project. Is this possible
for a non-admin to do? And if so, how would we do this?
We're using Project Server 2007
|
3/9/2010 3:18:06 PM
|
1
|
=?Utf-8?B?SHV0Y2hpbmdzag==?= <Hutchin...@discussions.microsoft.com>
|
Import Timesheet into Tasks - Timesheet selection dropdown list
All,
The dropdown list to select a timesheet in the "Import Timesheet" page
(resultant of clicking on "Import Timesheet" from "My Tasks" page) is HUGE.
It is so big because it includes every period since we started using Project
Server 2007.
Is there a way to sort this list, descending order??
Is there a way to shorten this list, by any criteria??
Thanks so much.
|
3/9/2010 3:09:01 PM
|
0
|
=?Utf-8?B?UGVkcm9Kb3Nl?= <PedroJ...@discussions.microsoft.com>
|
Sending a timesheet with a message
Hi,
When a Team Member is submitting his timesheet, he can send a message as
well. Can anyone tell me how the Project Manager can read the message during
the task update process?
Never can read it anywhere!
Daniel
|
3/9/2010 2:15:01 PM
|
7
|
=?Utf-8?B?RGFuaWVs?= <dan...@discussions.microsoft.com.>
|
Project Owner on the Cube.
Dear All,
Where can I add the project owner name to OLAP cube for PS 2007; to show
project owner name on pivot report.
Regards
|
3/9/2010 12:33:02 PM
|
2
|
=?Utf-8?B?QWhtZWQgR2hhaXRo?= <AhmedGha...@discussions.microsoft.com>
|
MS Project Server 2007 - Analysis Services Server Question
When identifying the anaylsis services server in the Cube Building section of
'server settings', can we use the "/" character to identify our server? We
have two analysis servers running on the same box. I try to type in the
character, and it does nothing.
--
ITPM
|
3/8/2010 10:30:01 PM
|
3
|
=?Utf-8?B?SVRQTQ==?= <I...@discussions.microsoft.com>
|
View Effective Rights 2007 with multiple databases
I just thought I'd post a solution to a problem that I've been frustrated
with for months. Perhaps others will find this useful.
Problem: View Effective Rights in the Project Server 2007 Resource Kit
doesn't allow the user to swich databases if there are multiple databases on
the server. There is also a message about this problem at
http://technet.microsoft.com/en-us/library/cc197528.aspx. that states:
Caution:
There is a known issue for the tool in which the list of databases returned
for the “Check permission”, “for user”, and “on project” fields will
automatically popul
|
3/8/2010 10:09:02 PM
|
2
|
=?Utf-8?B?dHJq?= <...@discussions.microsoft.com>
|
Verify CU installation
Hello,
I installed the FEB2010 CU for Project Server 2007. before that we were on
SP2 and the Dec. CU.
It all seems fine, but when I found some inconsistancies when I try to
validate the installation. I queried the published database's version table
to check for the update, but it is not there, it only shows the my Dec and
prior updates. However on the app/web server, it shows in Add and Remove
programs that the update is installed.
I also queried the content database for WSS and it returns the update.
I suspect that it was all successfully installed, but it worries
|
3/8/2010 9:57:01 PM
|
7
|
=?Utf-8?B?SmVublBlbm4wNw==?= <JennPen...@discussions.microsoft.com>
|
Message Queue Job Status: Waiting To Be Processed
When ever if I save the project file from Office Professional 2007, the Job
is in Message Queue (Status : Waiting To Be Processed)
http://i50.tinypic.com/2qx8ew7.jpg
Appreciate if you can help with your inputs.
Thank you
|
3/8/2010 9:26:01 PM
|
8
|
=?Utf-8?B?c2dPcmNoaWQ=?= <sgOrc...@@newsgroup.nospam.com>
|
Ideas for a Dept Level Application Support
We have an IT group that supports 50 applications and they wish to capture
support time by application during course of the year. During the course of a
week, any application or combination of applications can have support
requests, so it is different week to week and not predictable. Essentially we
are looking to park the time with appropriate application after the work is
complete.
We are using Project Server 2007 and have investigated the following:
1. Created a Annual Support workplan with a task per application in Project
Pro with the IT group added as Enterprise resourc
|
3/8/2010 8:00:01 PM
|
4
|
=?Utf-8?B?VGhvbWFzIFJvc2U=?= <ThomasR...@discussions.microsoft.com>
|
Attempting to pull out data to create Timesheet report - help!
I am able to pull out the reported time from the timesheets but ran into a
few problems. (I'm working off the EPM timesheet and also pulling in custom
data)
1. I see a DayofWeek and DayofMonth field, but I cannot locate a MonthofYear.
2. I want to also add the entries for the Administrative time, but I cannot
locate where those values are stored. What's stranger is that those values
are also not populating when I do a regular Data Analysis view with the
timesheet data, totals, and timesheet classification. I know that there is
data there. Is there a bug?
Thanks in advan
|
3/8/2010 4:15:01 PM
|
1
|
=?Utf-8?B?Qm9ubmll?= <Bon...@discussions.microsoft.com>
|
MS Project Office and PWA
This is a strange problem i am facing. One of the resources is having this problem. He has entered only 8 hours each in PWA for 2 weeks (80 hours). In project plan it shows that he has enetered 8 hours each for 4 weeks(160 hours). Any idea what might be causing this issue. This is just happning to one user and i am very sure that no one is manually updating Project Plan
|
3/8/2010 4:03:28 PM
|
0
|
Vijay <u...@msgroups.net/>
|
Email Notifications
How do you deselect the send
email notifications when we publish timelines?
Currently, we have many people in the resource pool with 2 extra
characters prefixing their email addresses so that email is not valid
and they don't get the notifications, but our network admin does not
like this method.
I don't really want to clear the smtp email because some people we
want to get these emails.
We also don't want to have to rely on each user going into their
personal settings to deactivate it themselves.
Is there any way other than the things mentioned here?
|
3/8/2010 3:23:41 PM
|
1
|
Alice Roman <a...@novec.com>
|
Admin Time off
I need to create a report displaying status of the Administrative Time for
the managers to keep track of admin time already approved or pending.
Administrative Time can be approved while Timesheet is
in the future and waiting for approval. How can I separate these two
(Timesheet and Admin Time Off) for the reporting purposes? What field in the
database gets
updated when manager approves Admin time request? And what is the
Enterprise Resource Pool where this approved Time Off is reflected? How can I
see it?
I had all SDKs with the PJ 2007. I created report, but it shows In Pr
|
3/8/2010 2:42:01 PM
|
0
|
=?Utf-8?B?bGFndW5h?= <lag...@discussions.microsoft.com>
|
My Tasks view doesn't update to previous version after rejecting u
Hello,
I'm using Project Server 2007 on Win XP Pro. My problem is connected with
updating tasks, after these steps:
1. User changes status of his task (for example: his progress of the task)
and then saves and submits these changes.
2. His manager rejects changes made by the user and publish his decision in
the project.
User gets the info about rejection, but still sees changes made by him and
can't get previous task status (the status before changes made by user). On
the other hand when you look at project in Project Center task status is
correct (without changes made by use
|
3/8/2010 12:39:01 PM
|
3
|
=?Utf-8?B?c3p5bWVu?= <szy...@discussions.microsoft.com>
|
Hide planned work from Timesheet
Is it possible to hide the Planned Work from the Timesheets?
For overtime work and non-billable work, there is a choice, but I can't find
the option to hide the Planned work.
Any idea anyone?
|
3/8/2010 11:49:01 AM
|
3
|
=?Utf-8?B?QmVuIFdpZWdlcnM=?= <BenWieg...@discussions.microsoft.com>
|
Read/Write access only within department,
If I have users that belong to multiple departments, but I want to limit
their read/write access only to projects within the departments that they
belong to, how I can do this ?
Thanks.
|
3/8/2010 11:40:01 AM
|
1
|
=?Utf-8?B?Y3Rk?= <...@discussions.microsoft.com>
|
Architecture Project Server 2010
Hello,
As Project Server 2010 will include a lot of "servers" : SQL Server,
SharePoint Server, Exchange server, Portfolio server... what would be the
best distribution of all these software within 2 machines?
Thansk for your help.
|
3/8/2010 11:08:25 AM
|
2
|
"Xiao" <nos...@nospam.com>
|
I cannot add subproject
Hi,
I'm using Project Server 2007 Enterprise Edt. with Project Pro 2007. I
create and publish 2 or 3 projects. i want to create Master Project. When i
add Subproject from Project Server, screen is flash but Project do nothing. I
cannot add a subproject.
Anyone see this problem before?
Thanks...
|
3/8/2010 10:47:01 AM
|
2
|
=?Utf-8?B?w5Z6Y2FuIEVMTUFMSQ==?= <zcanELM...@discussions.microsoft.com>
|
Work at Home - Earn 20,000 Weekly Without Investment Its Not A Fake, 100% Earning Guarantee
Work at Home - Earn 20,000 Weekly Without Investment Its Not A Fake,
100% Earning Guarantee
for start earning click here now
http://www.tkqlhce.com/click-3823529-10751048
http://www.tkqlhce.com/click-3823529-10751048
http://www.tkqlhce.com/click-3823529-10751048
http://www.tkqlhce.com/click-3823529-10751048
|
3/8/2010 5:23:30 AM
|
0
|
makemoney online <onlinemakemoney...@gmail.com>
|
Project Workspace Access outside of Group Memberships
Hi Guys,
Can anybody tell me if I grant access to a project workspace on PWA to a
member who is a member of our Sharepoint and AD but not on any of our Project
Server Groups.
Thanks
Shane
|
3/8/2010 3:13:01 AM
|
1
|
=?Utf-8?B?U2hhbmVfSA==?= <Sha...@discussions.microsoft.com>
|
project server was unable to find specified project
I have installed a Project server 2007 and created the project. Saved on the
server.
In PWA, I am unable to find my project. When I tried to open the project
(using Microsoft Office Project Professional 2007, which remembers last
entry) I get the folloing error. project server was unable to find specified
project.
How do I resolve?
Thank you
|
3/7/2010 11:55:01 PM
|
3
|
=?Utf-8?B?c2dPcmNoaWQ=?= <sgOrc...@@newsgroup.nospam.com>
|
Opening Projects with Project Pro is slow
Hi,
do you have any recommendations how to tackle performance bootlenecks when
opening project plans wiht Project Pro is sometimes very slow?
Thanks for any advice
Adrian
--
Adrian Miller
|
3/7/2010 11:44:45 AM
|
3
|
"Adrian Miller" <adrian.mil...@hotmail.com>
|
How to hide Grantt chart in Project Center view ?
In Project Center, does anyone know how to display just the project list, but
not the grantt chart ?
Thanks,
ctd
|
3/7/2010 10:34:01 AM
|
1
|
=?Utf-8?B?Y3Rk?= <...@discussions.microsoft.com>
|
Creating a Data Analysis view with Custom field and EPM Timesheet
My goal is to generate a report using timesheet data that summarizes totals
by a custom task field.
I had created a custom enterprise field at the task level that contains a
text code. These codes are used throughout various projects.
I know that there is no out of the box solution and that this data is not in
the EPM Timesheet cube. I currently have a way of using SQL queries to join
the Task information to the custom field (thanks Rod!) and export standard
data out to an excel spreadsheet. But, it is not a great solution since it
requires an intermediary to run any type
|
3/7/2010 5:12:01 AM
|
0
|
=?Utf-8?B?Qm9ubmll?= <Bon...@discussions.microsoft.com>
|
Create new project in PWA with custom fields
Hello,
I hope someone can point me to the right direction since I'm so new to PS
2007 and PSI.
I need to create a custom page in PWA that allows users to create a new
project. In my custom page, there are custom fields/dropdownlists with
values. For example, I will need to populate a dropdownlist with division
names (A, B, C, or D...), and the values of other dropdownlists on the page
will be populated based on whatever division name I select from my
dropdownlist.
For this, I create a custom webpart page, and created custom field
"Division" with lookup table "Divivison
|
3/6/2010 4:41:01 PM
|
4
|
=?Utf-8?B?Y3Rk?= <...@discussions.microsoft.com>
|
Possible to delete the Workspace of a project ONLY for re-creation with a new template?
I've improved the central template about a day after a user of mine
create two new project workspaces (that aren't being used yet). I
want to get rid of the ones that are out there and have them republish
using the new template.
Normally, I go out and delete the project from the published database
ONLY and check the option to delete its associated workspace/
sharepoint site.
Is there a way to just delete the workspace without touching the
project in either the draft or published databases so that it can be
re-created with the new template?
Thanks,
Andy Novak
UNT
|
3/5/2010 11:04:20 PM
|
1
|
"ano...@unt.edu" <ano...@unt.edu>
|
Applied Task Update Requests and Errors into project plan
Using MS Project Server 2007 and Timesheets.
I have several task updates that were cancelled in the Queue. They now
display in PWA Task Updates page in the Applied Requests and Errors view as
"X" errors. each task is labeled as accepted by the PM.
How do I get these to push into the project plan or back to the task updates
page to re-approve? I tried using the Sync Protected Actuals feature in the
plan, but nothing happen.
--
Mike F
|
3/5/2010 9:25:55 PM
|
3
|
=?Utf-8?B?TWlrZSBGaXNoZXI=?= <MikeFis...@discussions.microsoft.com>
|
PS Cleaner
Using Project Srever 2003 with SP3. We have installed the PS Cleaner Tool on
our Server. We are able to have the utility retrieve all projects on the
database, but, everytime I try to delete a file, I get a failure
notification. However, I am able to delete resources using the PS Cleaner.
Does anyone have any ideas on what may be preventing us from deleting project
files? Thanks.
|
3/5/2010 8:07:01 PM
|
1
|
=?Utf-8?B?ZGNsYXJjcQ==?= <dcla...@discussions.microsoft.com>
|
Actual Hours Appear in Timesheet without Being Entered by Resource
When resources create their timesheets actual hours are appearing in some instances. When viewing the MS Project file the actual hours appear there as well. The planned hours match the actual hours into the future. The PMs do not apply actuals in MSP - only through the timesheets. Any ideas on why this is happening?
Submitted via EggHeadCafe - Software Developer Portal of Choice
Join Lists with LINQ - SharePoint 2010
http://www.eggheadcafe.com/tutorials/aspnet/b0c1cd0d-fe82-444e-a16e-7d3fb7d38eca/join-lists-with-linq--sh.aspx
|
3/5/2010 7:56:18 PM
|
2
|
Nicole McIlwain
|
Timesheet issue
Running PS 2007
When some but not all of our resources click on a Timesheet, it displays 2
copies of the same timesheet
at the top of the screen it says:
My Timesheet (2)
then it displays the timesheet
when they scroll down on the screen, it displays the exact same timesheet
but it does not have the (2).
This happens for ANY time period that they click on.
We've rebooted the entire system.
Any suggestions?
|
3/5/2010 6:28:01 PM
|
1
|
=?Utf-8?B?U2hlcmk=?= <Sh...@discussions.microsoft.com>
|
Enterprise tags
In the Task Form a tag is showing up after the prodecessor and successor
names. The tag is (enterprise). This isn't allowing me to use the pulldown
and pick a task as a predecessor or successor. Where is the switch to delete
this tag form each task?
|
3/5/2010 6:19:01 PM
|
1
|
=?Utf-8?B?S2Vu?= <...@discussions.microsoft.com>
|
change owner of draft project
I wonder how owner of a draft project can be changed.
For published project it can be done using web access but draft projects are
not visible there.
|
3/5/2010 3:40:01 PM
|
1
|
=?Utf-8?B?RHJvbWJvbA==?= <Drom...@discussions.microsoft.com>
|
Filter in Resource Usage view
Hello,
Could you give me some idea to create a filter on the Resource Usage view
(Project Pro 2007 connected to Project Server) so that it will not display
the projects the name of which has been changed and the first 6 characters
are "Closed".
Thanks for your help
|
3/5/2010 12:52:49 PM
|
0
|
"Robert" <rob...@libre.gaulle>
|
BaseLine the project
Hi All,
I Just want to know how baseline will work in project plan.
in my project, i have base lined one task, later i changed the finish date
of that task and re base lined.
now here is the problem: after that i base-lined entire project but baseline
start and baseline finish showing N/A.
could you please clarify me in this.
Thanks,
Chanti
|
3/5/2010 4:43:02 AM
|
1
|
=?Utf-8?B?Y2hhbnRpMDYw?= <chanti...@discussions.microsoft.com>
|
Is there a way to tell if MS Project Pro is connected to Project Server?
I'm being tasked with working with MS Project (2007) and Project Server.
One of the process I need to run is dependent on whether MS Project Pro is
connected to the Project Server or not. I learned today that one of the
users habitually start PP without connecting to Project Server which means
my code doesn't have access to enterprise fields.
Is there any way, in VBA, to tell if the currently open project is connected
to the Project Server?
Being new to this, I may not have all the nuances and terminology under
control so don't hesitate to drill me for details.
Thanks in
|
3/4/2010 10:54:47 PM
|
3
|
"George Hepworth" <george_hepwo...@hotmail.com>
|
Can A PM Delegate PM Authority?
Is it possible for a PM to delegate his permissions to someone else? We have
PMs who want to be able to manage their project on the server, but they also
want to be able to just tell their assistant to approve task updates or
republish a project.
|
3/4/2010 8:32:04 PM
|
5
|
=?Utf-8?B?S2V2aW4gU2xhbmU=?= <KevinSl...@discussions.microsoft.com>
|
Importing Timesheets process
I am creating a recport for the managers to show who haven't imported their
timesheets yet. I see that in the TimesheetActula the hours are there as soon
as they are approved by the manager. Where in the Reporting db I can find
data that gets updated when Importe occurs?
Thank u much
|
3/4/2010 7:43:03 PM
|
2
|
=?Utf-8?B?bGFndW5h?= <lag...@discussions.microsoft.com>
|
Alerts for Timesheets
I need to generate an Alert to the employee who didn't submit the Timesheet
by the certain time. Next step - send Alert to the manager. The
out-of-the-box Alerts are for Tasks and Jobs. How to create one for
Timesheets?
Any ideas?
Appreciate your help
|
3/4/2010 7:20:01 PM
|
3
|
=?Utf-8?B?bGFndW5h?= <lag...@discussions.microsoft.com>
|
Using ODBC in MOPS2007?
I am curious about possible uses of the ODBC option for opening project in
MSP2007 Server. What are the possible advantages or usage scenarios?
Thanks for the general education.
|
3/4/2010 7:11:01 PM
|
7
|
=?Utf-8?B?UXVpenplZCBhZ2Fpbg==?= <Quizzedag...@discussions.microsoft.com>
|
Surrogate Timesheet
dWe're using PS 2007. For some reason LastStatusChangeResourceNameUID in
Timesheet table is NULL. It prevents me from identifying surrogate
timesheets. What do I need to do to make this field populated when Resource
Manager submits timesheet for his resource?
|
3/4/2010 7:10:04 PM
|
0
|
=?Utf-8?B?bGFndW5h?= <lag...@discussions.microsoft.com>
|
Admin Time handling and Reporting
I need to create a report displaying status of the Administrative Time for
the managers to keep track of admin time already approved or pending.
Administrative Time can be approved while Timesheet is
in the future and waiting for approval. How can I separate these two
(Timesheet and Admin Time Off) for the reporting purposes? What field in the
database gets
updated when manager approves Admin time request? And what is the
Enterprise Resource Pool where this approved Time Off is reflected? How can I
see it?
|
3/4/2010 7:08:08 PM
|
1
|
=?Utf-8?B?bGFndW5h?= <lag...@discussions.microsoft.com>
|
Migration of formulas between DEV1 and DEV2 instances of MSPS 2007
We have several custom fields using formula's in a DEV1 environment. We have
a second environment, DEV2, configured to connect with a financial package
(DSL) using a Microsoft developed connector.
We wish to move the fields (and views) in DEV1 to DEV2. When we run playbook
we get error message '09:54:09 : WARNING: View CW Team Members Reports
uses non-backed-up custom field Estimate Hours Remaining. This view will not
be backed up.' for each field with formula.
I have seen some blog indication that playbook might not handle custom
fileds with formulas well but no recommen
|
3/4/2010 5:00:03 PM
|
3
|
=?Utf-8?B?UGVuIFN0b3V0?= <PenSt...@discussions.microsoft.com>
|
Error when open My Tasks Page Project Server SP2
Dear All,
I show the following error when open My Tasks Page:
(An unexpected error has occurred.
Web Parts Maintenance Page: If you have permission, you can use this page to
temporarily close Web Parts or remove personal settings. For more
information, contact your site administrator.
Troubleshoot issues with Windows SharePoint Services. )
This happened for few resources not all.
I sure this problem not for IE because I was try the user name and password
on my machine and appeared the same error.
We working on project server sp2 and hotfix KB977028 installed for
|
3/4/2010 4:54:01 PM
|
2
|
=?Utf-8?B?QWhtZWQgR2hhaXRo?= <AhmedGha...@discussions.microsoft.com>
|
Upgrading project server 2007 SQL 2005 DB to SQL 2008
Does Project server 2007 support SQL 2008? If so can someone direct me to
the white papers on the proper procedure to migrate from SQL 2005 to SQL 2008?
--
teekay
|
3/4/2010 4:16:10 PM
|
2
|
=?Utf-8?B?dGVla2F5Mzc=?= <teeka...@discussions.microsoft.com>
|
PS07 Task Updates performed in Timephased View and actual hours mo
We use PS07 and update our tasks daily via the My Tasks page and the
Timephased view. The task updates are typically accepted everyday and the
projects are published via the publish feature on the 'Applied Task Update
Requests and Errors' page.
Then we're seeing that hours submitted one day are not there the next day in
the resources 'My Tasks' view, or they have moved to other days and have
weird hours. When the project plan is opened in Project Professional, the
actual hours do not match what was updated and they do not match what PWA
currently shows.
Does anyone have
|
3/4/2010 2:00:06 PM
|
2
|
=?Utf-8?B?SlA=?= <...@discussions.microsoft.com>
|
Reporting on MS Project Server in java
Hello,
I am trying to use MS Project server PSI in java.
I could create java stubs by using the wsdl.
Now if I want to see all the projects, I couldn' find any API in the Project
Web Service.
I couldn't find any help related to the same.
Is there any way where I can get list of Projects availaible in MS Project
Server or do I need to go through the reporting database route?
I wanted to use the WEB SERVICE route as I dont have to worry about the
security.
Any help would be appreciated.
Thanks in advance,
Milind.
|
3/4/2010 1:55:01 PM
|
2
|
=?Utf-8?B?TWlsaW5kIEpvc2hp?= <Milind Jo...@discussions.microsoft.com>
|
distribute the CPU power between two processes
Hello,
In the Task Manager of Windows Server, we have two queuing processes:
Microsoft.Office.Project.Server.Queuing.exe
- One for WSS
- One for SSP
How can we distribute the CPU power between these two processes?
Thanks
|
3/4/2010 12:55:17 PM
|
4
|
"Robert" <rob...@libre.gaulle>
|
Not able to save project plan erro id:20010..please its urjent
Hi All,
i am facing a problem in office project 2007, when i try to save an existing
plan its throwing an error job failed error id:20010
this is an sub project, i tried with y admin permissions and i checked
additional server settings to allow master project to be checked.
please help i need to publish the plan by today
thanks,
chanti
|
3/4/2010 11:26:01 AM
|
3
|
=?Utf-8?B?Y2hhbnRpMDYw?= <chanti...@discussions.microsoft.com>
|
error in http://epm2010/pwa (Unexpected error occured)
I have installed sqlserver 2008 beta , sharepoint portal server 2010 beta and
project server 2010 beta and install prerequisties of sharepoint portal 2010
sql server 2010 and sp1 of sql server 2008 and 5 cummulative updates of
sqlserver 2008.
and site provision has done .
but when i open the site on browser .
It will raise an error which is :
Error :
An unexpected error has occurred.
Troubleshoot issues with Microsoft SharePoint Foundation.
Correlation ID: 56078739-4765-45cb-bcee-493816474e9e
I dont know whether some services or what is missing to start.
kind
|
3/4/2010 9:41:01 AM
|
1
|
=?Utf-8?B?U2Ft?= <...@discussions.microsoft.com>
|
when click on "create project web access site" in 2010 error gener
Error :
No web applications were found in the farm.
Troubleshoot issues with Microsoft SharePoint Foundation.
Correlation ID: bc723c55-7e26-46c8-9a2d-3d1175289493
Date and Time: 3/3/2010 11:43:13 PM
|
3/4/2010 7:49:01 AM
|
1
|
=?Utf-8?B?U2Ft?= <...@discussions.microsoft.com>
|
how can we create dashboards for EPM in Project web access
how can we create dashboards for EPM in Project web access and in other
website for EPM or in sharepoint sites.
|
3/4/2010 4:30:01 AM
|
4
|
=?Utf-8?B?U2Ft?= <...@discussions.microsoft.com>
|
Project Server Cube Build Issue
I think I screwed up the install order on the SQL DMO components. According
to MSDN:
" At this time, do not use the feature packs for SQL Server 2008 to install
and download these components, as those files will not allow you to build
cubes in SQL Server 2008 Analysis Services with Project Server 2007."
However, I didn't read that carefully enough and installed the Microsoft SQL
Server 2008 Management Objects Collection instead of the 2005 version. Now I
can't install the 2005 version even if I uninstall the 2008 version. The
setup fails with the "higher version already exist
|
3/3/2010 6:32:01 PM
|
3
|
=?Utf-8?B?QnJ5YW50IExpa2Vz?= <BryantLi...@discussions.microsoft.com>
|
Issue enterting time in My Tasks and Question about Assignment Own
Hi! My company is in the process of rolling out onto PS 07 (we are upgrading
from PS 03). We've put on service pack 2, followed all the directions, got
our server up and running with the new time phase view in My Tasks. When we
had done initial testing with dummy projects the time phase worked GREAT!
Prefect for us since we only want to track project time and not make it too
confusing for our users with having to import between timesheets and tasks
(resources do need to be babied and cuddled to keep them happy!). We have
our Task Settings and Display set up as follows:
Tra
|
3/3/2010 6:31:01 PM
|
5
|
=?Utf-8?B?VHVja2V5?= <Tuc...@discussions.microsoft.com>
|
More OLAP Issues
Hello,
We have been building OLAP cubes for a few weeks now with 2007. They build
nightly at 11:30 and take about 10-15 mins. Last week, we got the error below
one morning. We restarted Analysis Services on our SQL box and was able to
build successfully again. About one week later, we are seeing the error
again. Restarting AS creates some down time for other groups using it and is
not something we would like to do regularly. Can anyone provide some insight
as to what the root cause of this is? What can we to to find a perminate
solution to this error?
Thanks
P.S. we have SQL 2
|
3/3/2010 4:56:09 PM
|
5
|
=?Utf-8?B?TWljYWg=?= <Mi...@discussions.microsoft.com>
|
Future Resource Hours Being Added to Work Not Started
Is anyone seeing future hours being entered into Project 2007 plans for
tasks? Project managers review and accept resources’ tasks hours weekly. But
I’m seeing tasks with actual work hours, in them, sometime two months ahead
of the project. Our tasks are set to Fixed Duration. The hours that I’m
seeing are like .38 .08 . .03. We account hours to the .5 only. Please let me
know.
Thanks!!!
|
3/3/2010 4:05:01 PM
|
3
|
=?Utf-8?B?SmVubmlmZXI=?= <Jenni...@discussions.microsoft.com>
|
All Resources with OverAllocated
Hi Friends, I Need a report or view with All Resources Overallocated by
Day....
How do I its ?
the option in PWA : Resorce Center-View availability has limit 100 resources
and i have over 3500 resources... Thanks for help me...
|
3/3/2010 3:38:01 PM
|
6
|
=?Utf-8?B?QWxsIFJlc291cmNlcyB3aXRoIEF2YWlsYWJpbGl0eSBpbiBnYW50dA==?= <AllResourceswithAvailabilityin
|
how to create a customize reports in project server 2007
we need to create a customize status reports weekly on our required format.
|
3/3/2010 11:46:01 AM
|
4
|
=?Utf-8?B?U2Ft?= <...@discussions.microsoft.com>
|
Permissions in Project Center
Hi,
I `ve a problem with permissions in Project Center. All users can view all
projects but the users don´t have permissions in all projects.
I`ve created an user with permissiones of member of group, without
permission and resource of any project, and can view all projects.
Any idea?
Thanks
|
3/3/2010 10:57:01 AM
|
1
|
=?Utf-8?B?VmljZW50ZQ==?= <Vice...@discussions.microsoft.com>
|
Errors in queue jobs
We suddenly started to have errors in job queue when someone is trying to
save timesheet. There are two different errors that are related to timesheet
saving. We have tried to find the problem but no luck so far. Any suggestions
what is causing this? Errors are listed down below.
Error summary/areas:
Queue
GeneralQueueJobFailed
Error details:
<?xml version="1.0" encoding="utf-16"?>
<errinfo>
<general>
<class name="Queue">
<error id="26000" name="GeneralQueueJobFailed"
uid="df309f89-27f5-40ad-b2d0-969788fb1f0d"
JobUID="10099067-74a0-450d-abe9-88276403a9a0" Com
|
3/3/2010 10:01:01 AM
|
0
|
=?Utf-8?B?Snlya2k=?= <Jy...@discussions.microsoft.com>
|
Data missing from enterprise custom task fields after migrating
We can see the enterprise task fields, but none of the data is displayed in
files migrated from Project Server 2003 to 2007. Any ideas?
--
michael
|
3/3/2010 3:42:01 AM
|
1
|
=?Utf-8?B?bWljaGFlbGo=?= <notreallyme.com>
|
Last login date by a work resource
Hi,
Can some please help me to get to know the latest date when a work resource
logged in project server 2007?
|
3/2/2010 11:51:07 PM
|
1
|
=?Utf-8?B?R1A=?= <...@discussions.microsoft.com>
|
Account Names not showing when adding new user
Hi,
I created a SharePoint site off of a 2007 Project Server install and when
adding users to access the SharePoint site, directory services only returns
admin users of the SharePoint/Project Server? How do I get AD to return all
the users in the domain?
Thanks! Steve
|
3/2/2010 9:46:02 PM
|
1
|
=?Utf-8?B?U3RldmU=?= <St...@discussions.microsoft.com>
|
Task and Resource Grouping together
I have my projects task level capitalization defined w/ task level custom
fields (cap/exp) and I have a resource custom field for labor
(internal/external)
I can define groupings within the usage views to see either of the two;
however I need to go the extra step and build a view htat could show Cap and
Exp data for both Internal and External resources.
Given that they are custom fields of different type is there a way to
present this request within the client?
Thx in adv!
|
3/2/2010 6:33:02 PM
|
1
|
=?Utf-8?B?cHJvamVjdHNlcnZlcmRyYWdvbg==?= <projectserverdra...@discussions.microsoft.com>
|
Project Server Account
Is there a way to add a project server account through the use of the Office
Customization Tool? I want to be able to deploy ms project 2007 with the
project server account specified.
|
3/2/2010 6:26:01 PM
|
1
|
=?Utf-8?B?Q29sbGlu?= <Col...@discussions.microsoft.com>
|
Duplicate Resources on 2007 Project Import from 2003 (with actuals
I am trying to use the project Import Wizard in migrating Project Server 2003
plans to Project Server 2007 plans.
One big issue I am having, is that some of these plans have actuals and are
in progress, and when I run the import, it is adding both the original
resource 9from 2003 which is spelled first name, last name) as well as the
new resource as it exists in 2007.
I am a bit confused, since I am "mapping" the old resource on the plan to
the 2007 enterprise resource when I go through the wizard.
Migration works much smoother on plans with no actuals entered. Is this a
|
3/2/2010 4:08:02 PM
|
1
|
=?Utf-8?B?d2RyaXR0?= <wdr...@discussions.microsoft.com>
|
Resource Plans - still flaky
I have not used Resource Plans for some time. I have always found them
a bit flaky. I just revisited them with the October hot fix, and this
still seems to be the case. Whenever you incorporate a generic
resource in my environment the resource plan errors on save. This
seems to be because I choose to set max units value for generic
resource to 0%. I suspect it's provoked by trying to do FTE
calculations which it does not do very well. Am I the only one to
experience this problem?
rgds
Mike
|
3/2/2010 11:13:52 AM
|
5
|
Mike Mahoney <sleekst...@msn.com>
|
Project ID
Hello,
We have EPM 2007.
I found out that the Project ID is a very long number (more than 30
characters).
I want to change this number to something else. the need is an interface for
other systems.
Any idea ?
P.
|
3/1/2010 10:33:54 PM
|
1
|
"Poni" <P...@gmail.com>
|
PWA, My Tasks Page, Gantt View Not Available Why?
I am starting to learn Project Server.
In PWA, the My Tasks page, I am trying to select the GO TO => "Tasks Gantt
View", but it is greyed out.
Can anyone tell me why that might be?
|
3/1/2010 8:14:06 PM
|
2
|
=?Utf-8?B?UmVkbmVjayBEYXZpZA==?= <RedneckDa...@discussions.microsoft.com>
|
How to get Last modified date of MPP files
Hi,
I want to filter out all the project which has been not modified by since a
date.how will I get the lost modified date of a Project ?
|
3/1/2010 8:01:01 PM
|
5
|
=?Utf-8?B?R1A=?= <...@discussions.microsoft.com>
|