One way:

If you are entering your numbers in column A, say, then in column B 
enter:

B1:     =(A1*3)*(1-40%)

or, better,

B1:     =A1*3*60%

copy B1 down as far as necessary.

In article <678FA28E-14A7-40E5-B0DF-54D574F9F7E3@microsoft.com>,
 wbinfo <wbinfo@discussions.microsoft.com> wrote:

> On a new spread sheet I am entering numbers and I would like them to be 
> multiplied and changed automatically. The formula is x*3 then less 40%.
> 
> Can anyone help me.
0
jemcgimpsey (6723)
9/28/2005 5:00:31 PM
Do you want them changed in the same cell in which you type them?

You would then have no paper trail for checking errors in input.

John's suggestion about having a formula in a separate column is the safest
way to go.

If you want to change them as you enter paste this code into a sheet module.

Private Sub Worksheet_Change(ByVal Target As Excel.Range)
'when entering data in a cell in Col A
On Error GoTo enditall
Application.EnableEvents = False
If Target.Cells.Column = 1 Then
        n = Target.Row
        If Excel.Range("A" & n).Value <> "" Then
        With Excel.Range("A" & n)
        .Value = .Value * 3 * 0.6
      End With
        End If
    End If
enditall:
Application.EnableEvents = True
End Sub


Gord Dibben Excel MVP

On Wed, 28 Sep 2005 09:42:02 -0700, wbinfo <wbinfo@discussions.microsoft.com>
wrote:

>On a new spread sheet I am entering numbers and I would like them to be 
>multiplied and changed automatically. The formula is x*3 then less 40%.
>
>Can anyone help me.

0
Gord
9/28/2005 7:41:15 PM
Reply:

Similar Artilces:

Automatic Appling AR documents
- I'm looking for a routine that can be scheduled to run through all unapplied payments and auto-apply them for all customers within a GP10 Company. Any/all assistance is appreciated. Thanks Jon Jon, I believe the Microsoft Professional Services team has a tool for sale that will do this. Your GP Partner should be able to help you with details and pricing on this. -- Victoria Yudin Dynamics GP MVP Want to use Crystal Reports with GP? http://www.flex-solutions.com/gpreports.html blog: http://www.victoriayudin.com "JColesby" <jcolesby@gmail.com>...

create a roster
How can you create a weekly roster in which functions can be assigned to more than 10 people. The roster should be updatable, so that when holidays and days off are marked on the weekly roster they will be taken account of it future rosters. ...

importing or creating reference footnotes
I am trying to import a word document into publisher and it has reference footnotes within the document. The reference footnotes are not coming into the publisher document with the reference footnotes. Correct, they will not up to Publisher 2003. In Publisher 2003 depending on which version of Word you are using if they will or not. -- "If you don't know where you are going, any road will take you there!" ...

Mailbox not created when AD account created
A couple of days ago I noticed that I created a user account but the 'Email Addresses' tab of the user properies did not list any email addresses. Subsequent new user accounts have all experienced the same. I researched the knowledge and tried the recommended solutions to either manaully start the recipient update service or rebuild te recipient update service. Neither recommendation has resulted in a mailbox being created for this particular user or any additional user that I have created since this error first showed up. I performed a Windows update last Thursday and so I bel...

Task Create - Status
I'm trying to make a simple task, when a user owner is assigned a task in CRM, it receives an email letting it know it has one. I have the following below, but it is not generating one when i assign one manually in the CRM. What to do? I've tried both the following: When task is created E-Mail to:[owner];Subject test As well as: When task is created if Task activity status = Open then E-Mail to:[owner];Subject test I've checked the mailserver many times over, and I can send emails manually from the CRM so you can rule that out Tested out ok on our end. Some ideas:...

Help Creating XmlNode / XmlAttribute Elegantly
I am creating a configuration class to read / write a standard configuration file. <?xml version="1.0" encoding="utf-8"?> <configuration> <appSettings> <add key="ConnectionString" value="server=(local);" /> </appSettings> </configuration> I am using a XmlDocument for my base implementation. I am looking to see if there is a better way to add a new node / attribute than using XmlDocument.InnerXml. I would consider this to be a hack but couldn't really see another way of doing this without definin...

Create external database
Hi all. I need to create an external database (file). On a site I found this code: ------------------------------------------------------ Function CreateLinkedExternalTable(strTargetDB As String, strProviderString As String, strSourceTbl As String, strLinkTblName As String) As String 'strTargetDB = Source Database Name 'strProviderString = Not used, currently hard coded 'strSourceTbl = Source Table name in the database we are linking too. 'strLinkTblName = Table name we would like to see in the Access Database. Dim catDB As ADOX.Catalog Dim tblLink As...

How to create pie chart with %
I have got a problem that I don't if excel could help me to calculate the % within a column and draw a pie chart. My case is I have a column containing a series of numbers. e.g. 1,4,8,1,3,9,11,2,4,5,6,.........etc I want to draw a pie chart that showing 1-3 , 4-6, 7-9, >9 with the corresponding % inside that column. Can anyone tell me how can I make it ? Ray - You need to calculate the frequencies in your data. Let's assume your data is in A1:A12. In B1:B3 enter these numbers, the upper limits on the groupings: 3 6 9 You can enter ">9" into B4 witho...

Email address not created when a new user is created
All, This issue recently happened in my company. Upon creating a new user, the policy was set to create the smtp and X400 address automaticaly. Now when we create a user the smtp and x400 addresses are not created, and when attempting to setup the new user in outlook, the address cant be found. We are using exchange 2003 SP1 on Win2k3 servers. On Wed, 13 Jul 2005 06:49:07 -0700, "Bryan" <Bryan@discussions.microsoft.com> wrote: >All, >This issue recently happened in my company. Upon creating a new user, the >policy was set to create the smtp and X400 addres...

how do I copy a range to a new sheet
Now that I this group solved my problem of flagging dates of my club members as "expired", how would I automatically copy all of the members that are expired to a new worksheet so I can use this for a mail merge? I would need to check the condition of the expired column, YES or NO, then copy the yes's name and address columns only to a new page. TIA Why not just add that column and when you use mailmerge, just include the records with that flag set the way you need? If you really want to copy the rows, you could apply Data|Filter|Autofilter and filter to show just those mem...

Exchange 2010 MRM, no log files being created
I'm hoping someone can help me with this issue....it has been driving me crazy for days. I have enabled MRM logging on our exchange server, and I can see that some of the policies are working when I run start-managedfolderassistant. We have a retention policy tag on the deleteditems folder, and this does work. The problem is I am not getting any files in the MRM log directory. C:\Program Files\Microsoft\Exchange Server\V14\Logging\Managed Folder Assistant Events 9021 and 9022 are logged in the Application log, but where are the files? Below is the output of my mai...

when form created
I have a form which was created by someone else (not a form template) which is like a questionnaire with empty boxes to be completed. When the boxes are typed in all the margins move to accommodate the words being typed. Is there a way to fix/lock the original form and then just fill in the blank boxes? I suspect this is set up as a table with auto resizing enabled. Displaying table gridlines (Table | Show Gridlines) will help you see what you're dealing with. Then select the table, go to the Table tab of Table Properties, click Options, and clear the check box for "A...

Creating a Brochure
How do you create a 3-column brochure from scratch for Publisher 2002? I can only find the directions for the 2003 version. Quick help would be appreciated, project is due Monday. Create a three-panel or four-panel folded publication http://office.microsoft.com/en-us/assistance/HP011646681033.aspx Scroll down to the section that says "Build a three-panel or four-panel publications from scratch." -- Mary Sauer MSFT MVP http://office.microsoft.com/ http://msauer.mvps.org/ news://msnews.microsoft.com "Derek" <Derek@discussions.microsoft.com> wrote in message news...

how many lines per sheet in excel 2003
ave they increased the number of lines in excel 2003 or is it still 65536 Still, ever heard of 'categorizing'? Danny On Sun, 17 Jul 2005 16:04:01 -0700, Des53 <Des53@discussions.microsoft.com> wrote: > ave they increased the number of lines in excel 2003 or is it still 65536 -- Using Opera's revolutionary e-mail client: http://www.opera.com/mail/ Hi Des, Row and column specifications are unchanged in xl2003 (65536 x 256). I have heard no suggestion that these are likely to change any time soon --- Regards, Norman "Des53" <Des53@discus...

Excel's Calculating Sequence
If I have a block of formulae , say, in A1:E10 and hit F9 is thare any particular sequence that the recalc is done ? e.g. by rows first and then columns etc. TIA Bill From the Help file: When are existing formulas recalculated? Excel recalculates those cells that are dependent on other cells that contain changed values. This type of calculation helps to avoid unnecessary calculations. Excel also calculates workbooks each time they are opened. Background calculation As calculation proceeds, you can choose commands or perform actions such as entering numbers or formulas. Excel tempor...

How to create Access macro shortcut
I'm still using Access 97 and saw something the other day that I would like to use that was in Access 2000. In an Access 2000 database, there was a .mam file in a directory that launched the Access 2000 program and ran a macro. How do you set this up? Can it be done in Access 97? If so, how? Hi. > How do you set this up? Select the macro in the Database Window and right click with your mouse, then select "Create Shortcut..." in the pop-up menu. Follow the prompts for where to place the shortcut and what to name it. The default is: <PathToDeskTopDir>\Shortcut ...

Enabling Macro But Hiding Sheets
I have created a simple macro that basically when a button is clicked i takes you to a certain page in the workbook. Is it possible to hide this page for different users. But when a use with the correct password comes he can click the button and he will b taken to the hidden page. Is it posible to do something like this along those line -- Message posted from http://www.ExcelForum.com It's possible, and if you search the archives: http://google.com/advanced_group_search?q=group:*excel* you'll find many ways to do this. You should know, however, that none of the methods will ...

Users mailboxes not created when user created
I have a problem that recently just started happening on my exchange 2003 server. When i create a new user account and create the mailbox for exchange, once im done, the mailbox isnt created, adn if you go into the properties of the user account adn go to the exchange email address tab, there isnt an smtp or an x.400 address listed. I am having to manually create and add these, adn then go delete the exchange mailbox and recreate it. This is really annoying and would love to know if anyone has any ideas of how to fix it. Thanks Jason In news:9F836A43-98BF-435A-AA43-AFF10124BE3F@micro...

moving records from one sheet to other
Hi I have 1400 records in one sheet. i want is as a read only sheet. now i need a selection cell and a push button for each and every record. when the shared users select their name from the selection cell then click one of the push button then the appropriate record should move to the sheet which is for that particular user. i have 15 sheets for every individual.can u plz help me out. i'm very new to excel. knight Hopefully this will help you some. This code would be attached to a single button - what it does is see if the currently active cell is in the proper column (with na...

Multiple tables output to multiple sheets in single excel workbook
Hi all, Been a while since I've done any access dev, and I can't for the life of me remember how to do this. I have 3 tables I need to export to Excel, preferably in one workbook as separate sheets. Using OutputTo simply overwrite the file, and I seem to recall using transfertext to accomplish this, but it says the file is read-only after the first table is output. Do I need to create an export spec? If so, how do I go about this? Or is this simply not going to happen without using the Office library reference and all that jazz? TIA, SusanV Thanks Tom - I'll give it a ...

How to disable automatic mail-enable for Public folders ?
Hello, Environment : Server Exchange 2003 SP2 - Operation mode: Native Mode (no pre-Exchange 2000 servers). When i create new public folders it by default is mail enabled - how i can disable this feature - i need that new created folders don't have e-mails by default. If i look in : http://www.microsoft.com/technet/prodtechnol/exchange/guides/E2k3AdminGuide/e9545541-ee66-415c-b5ba-b977d8a6b714.mspx?mfr=true "Folders created in native-mode Exchange Server 2003 must be mail-enabled manually." But - "Folders that you migrate from Exchange 5.5 are mail-enabled by defaul...

CRM should let me create custom fields in batch
Hi, With MS CRM v3.0, when we have a group of fields to create, it would be faster to be able to enter the list and then submit the list for processing. Thank you. Felix. ---------------- This post is a suggestion for Microsoft, and Microsoft responds to the suggestions with the most votes. To vote for this suggestion, click the "I Agree" button in the message pane. If you do not see the button, follow this link to open the suggestion in the Microsoft Web-based Newsreader and then click "I Agree" in the message pane. http://www.microsoft.com/Businesssolutions/C...

Creating an ad book
How do I divide a page into equal sections (halves, qarters, eights)? I need to scan and type ads and coupons into this booklet. New at this. After managing to set up OE-QuoteFix on his new PC, Ed reads a message from FRSH <anonymous@discussions.microsoft.com>... > How do I divide a page into equal sections (halves, qarters, eights)? Arrange > Layout Guides > Grid Guides -- Ed Bennett - MVP Microsoft Publisher http://www.mvps.org/the_nerd/ Before reading this message, view the disclaimer: http://mvps.org/the_nerd/disclaim.htm ...

Selecting column D automatically when you leave the sheet
I have an xl2003 workbook with several worksheets. Some sheet contain tables, or instructions, etc. Most of the sheets are identical templates i create as i need them. On these templates sheets, which are named 1, 2, 3, etc., I would like to, when i leave the sheet, I would like for the activecell.column to be column D. That is, when i leave the sheet, column D of the current row is selected. I have tried several ways to accomploish this, with no success. Thanks, Tosno You can use an Event macro to Select column D in the worksheet when the sheet gets deactivated: Private Sub Worksheet_Deac...

Access unable to create an MDE
I am getting this message when I try to make an MDE: "Access unable to create an MDE database" No error mesages or any other info is displayed. I haven't had this trouble before. Then I added a form, a couple reports, an create table query, modified a toolbar and added a module. Now I am getting this message. This database is a front end of a project with several linked table to a back end. Any suggestions? Thanks Jeff G Try compiling your application (under the Debug menu when you're in the VB Editor). Often an application will have some error that doesn't m...