I need a formula that will calculate future dates for me. If I were to insert 
todays date,(as an example) 13-june-2005 into excel, I need it to calculate 6 
weeks, 6 months, 1 year, 2 years, 3 years and 4 years ahead of the date 
specified. On top of this, the future dates cannot land on a weekend or a 
holiday.  I am aware of the WORKDAY function but don't know how to use it. My 
excel experience with formula's is limited. Very basic steps is required.

0
Richard853 (481)
6/13/2005 5:32:04 PM
excel.misc 78881 articles. 5 followers. Follow

3 Replies
338 Views

Similar Articles

[PageSpeed] 21

On Mon, 13 Jun 2005 10:32:04 -0700, mike richard <mike
richard@discussions.microsoft.com> wrote:

>I need a formula that will calculate future dates for me. If I were to insert 
>todays date,(as an example) 13-june-2005 into excel, I need it to calculate 6 
>weeks, 6 months, 1 year, 2 years, 3 years and 4 years ahead of the date 
>specified. On top of this, the future dates cannot land on a weekend or a 
>holiday.  I am aware of the WORKDAY function but don't know how to use it. My 
>excel experience with formula's is limited. Very basic steps is required.

So long as you are going to use the ATP, then the EDATE function is the
simplest way of adding months to your initial date.  It takes care of the
problem that can occur when adding six months and not having the resultant
month have enough days.  Or adding years to 29 Feb 2004.

To use the WORKDAY function so as to avoid falling on a weekend or holiday, you
need to have a range, which you may name Holidays, that contains a list of all
the Holiday dates.  You then subtract 1 from the calculated date, and add 1
workday to that result.  The result will be the first non-holiday, non-weekend
after your computed date.  (If you want the day before, then add 1 to the
calculated date and subtract 1 workday).


A2:	Initial Date
B2:	=workday(A2+42-1,1,Holidays)    	(6 weeks)
C2:	=workday(edate(A2,6)-1,1,Holidays)	(6 months)
D2:	=workday(edate(A2,12)-1,1,Holidays)	(1 year or 12 months)
E2:	=workday(edate(A2,24)-1,1,Holidays)	(2 years or 24 months)
F2:	=workday(edate(A2,36)-1,1,Holidays)	(3 years or 36 months)
G2:	=workday(edate(A2,48)-1,1,Holidays)	(4 years or 48 months)

This should get you started.  Let me know how it works out.


--ron
0
ronrosenfeld (3122)
6/13/2005 7:10:40 PM
Thanks Ron, that worked perfectly.
Enjoy yourself.
Mike

"Ron Rosenfeld" wrote:

> On Mon, 13 Jun 2005 10:32:04 -0700, mike richard <mike
> richard@discussions.microsoft.com> wrote:
> 
> >I need a formula that will calculate future dates for me. If I were to insert 
> >todays date,(as an example) 13-june-2005 into excel, I need it to calculate 6 
> >weeks, 6 months, 1 year, 2 years, 3 years and 4 years ahead of the date 
> >specified. On top of this, the future dates cannot land on a weekend or a 
> >holiday.  I am aware of the WORKDAY function but don't know how to use it. My 
> >excel experience with formula's is limited. Very basic steps is required.
> 
> So long as you are going to use the ATP, then the EDATE function is the
> simplest way of adding months to your initial date.  It takes care of the
> problem that can occur when adding six months and not having the resultant
> month have enough days.  Or adding years to 29 Feb 2004.
> 
> To use the WORKDAY function so as to avoid falling on a weekend or holiday, you
> need to have a range, which you may name Holidays, that contains a list of all
> the Holiday dates.  You then subtract 1 from the calculated date, and add 1
> workday to that result.  The result will be the first non-holiday, non-weekend
> after your computed date.  (If you want the day before, then add 1 to the
> calculated date and subtract 1 workday).
> 
> 
> A2:	Initial Date
> B2:	=workday(A2+42-1,1,Holidays)    	(6 weeks)
> C2:	=workday(edate(A2,6)-1,1,Holidays)	(6 months)
> D2:	=workday(edate(A2,12)-1,1,Holidays)	(1 year or 12 months)
> E2:	=workday(edate(A2,24)-1,1,Holidays)	(2 years or 24 months)
> F2:	=workday(edate(A2,36)-1,1,Holidays)	(3 years or 36 months)
> G2:	=workday(edate(A2,48)-1,1,Holidays)	(4 years or 48 months)
> 
> This should get you started.  Let me know how it works out.
> 
> 
> --ron
> 
0
6/13/2005 8:26:07 PM
On Mon, 13 Jun 2005 13:26:07 -0700, mike richard
<mikerichard@discussions.microsoft.com> wrote:

>Thanks Ron, that worked perfectly.
>Enjoy yourself.
>Mike


You're welcome.  Thanks for the feedback.

--ron
0
ronrosenfeld (3122)
6/14/2005 1:59:29 AM
Reply:

Similar Artilces:

filter by date and action
I have a table with three columns: Name Date Action Fred Today this Fred Today this Fred Today that Wilma Today this I want to sort by name and by date, but only if 'this' was done more than once on the same day, and not if 'that' was done on the same day,They have to perform this more than once, and they cannot have performed that on the same day. If not in excel, mssql maybe? Thanks, Harry On Aug 18, 1:53=A0pm, Harry <hamac...@gmail.com> wrote: > I have a table with three co...

Calculate Years/Months Between Dates and then Average
We are using the formula =DATEDIF(A1,NOW(),"y") & "." & DATEDIF(A1,NOW(),"ym") to calculate the years and months from an employee hire date. Is there an easy way to average the years and months for a group of employees with the results of that formula? You could use: =AVERAGE(A1:A10*1) Array-entered, meaning press ctrl-shift-enter. But you could also just change your current formula to: =1*(DATEDIF(A1,NOW(),"y") & "." & DATEDIF(A1,NOW(),"ym")) Then just use: =AVERAGE(A1:A10) which is *not* array-entered. ...

Transaction Date VS Business Date
Our accounting department needs/wants to have all RMS SO reporting by business date opposed to transaction date. Usually these are the same unless you have sales and batches that close after midnight. For our store I would like to set 3 a.m. as the business day closing time. So when I run any type of reports I would like to get the information for a business date (range) starting at 3 a.m. till 3 a.m. the next day. I guess I could accomplish this by subtracting 3 hours from all the transaction (date and) times but I would have to do this for every single report which would be a lot of ...

Formula displays does not calculate
Hello: I just typed a formula in a cell and it displays =A4+J13 (the same formula calculates fine in a different cell), instead of claculating the value. Both A4 and J13 contain numeric data. I try Ctrl+~ to toggle and chk if full formula mode was ON? but that did not help either. I also tried looking for feedback through the formula evaluation utility in Excel, no help there either, it says cell being evaluated contains a constant? Your help is appreciated Hi Neil, Perhaps the cell is formatted as text? --- Regards, Norman "Neil Bhandar" <Neil Bhandar@discussions.mic...

Post Dated Checks
I had to prepare some post dated checks and we did not have fiscal periods set up yet to match the dates of the checks. Currently the check batches are waiting to be posted. What is the best way to handle post dated checks? If I create new fiscal years to match these dates, I will end up having 4 Open years. Is this the only way to do it? You can manage post dated checks in Microsoft Dynamics GP with the Payment Document Management module available on the Feature Pack 1 DVD image. For more info, take a look at MVP Mohammad Daoud's post on the subject at: https://communit...

Calculate Column
Word 2007 I have a very simple chart in Word and I would like to make the last cell calculate the total of the above cells, as you can in Excel. To make the calculation Just insert the sum formula in the last cell of your chart. You should be able to access the "sum" button on the toolbar if you are working in charts. If it is a table that you're working with just click on the last cell, select "Table" and then select "formula." "Canon" wrote: > Word 2007 > I have a very simple chart in Word and I would like to make the last c...

OutlookXP Outbox issues.....
Hi, I have a client who recently purchased a notebook for use in the office and also on the road. The office: MS SBS2000 - Exchange Server Home : Shared ADSL connection Road : Dialup - either copper or CDMA Offline files have been enabled for both document files and also OutlookXP. We can retrieve email from the office Exchange server and also from other POP3 accounts, whether on or off site. When it comes to sending message when off site the fun begins. Option 1. I have configured an additional email account specifying the Exchange server addy, for the incoming, an...

Remove "Date: Yesterday" or "Date: Monday" from Outlook Inbox?
Outlook mail inbox now has headers that tell you what day the the email was sent. I find this visually annoying. Each emailalready has the time and day it was sent. I don't need the daily titles in the midst of the list of emails. How do I make them go away? I think you are talking about OL 2003 & the Arrange in Groups setting. Change it in View, Arrange by, uncheck Show in Groups. "silky" wrote: > Outlook mail inbox now has headers that tell you what day the the email was > sent. I find this visually annoying. Each emailalready has the time and day >...

Calculated Fields 04-18-07
We're helping someone with a relatively basic requirement for CRM, but they've thrown two awkward ones into the mix. The first of which is a desire to use some custom fields on an entity which are then automatically totalled. e.g. when they do a quote each item on the quote (free entry) has a custom field for the cost to the organisation of providing the service. On the main quote screen/report they need these to be totalled, in the same way that the built-in sell-price fields are. Is this possible without reaching for Visual Studio? I've had a look through a pile of...

Define an array based on calculations
Hi, well, I just miserably failed in posting my first thread. Hope I will be luckier this time. I have a couple of matrices (170) in one excel sheet and would like to calculate the correlation coefficient of all pair combinations. That will give me about 14000 correlation calculations. I already specified the pair combinations, where each matrix got the label 1, 2, 3... 170 and arranged in two different columns (AB, AC) like this: 1 2 1 3 .. 65 102 .. 169 170 All matrices are in the area of A1 to T4076, where each matrix has 20x20 cells with 4 empty rows between eachother. Basically, I ne...

strange date format problem
Hi, I downloaded some data on excel using Bloomberg. One column has dates and the other has numbers. Dates appear as 01/01/1980 format which I want in Jan-80 format. I have changed the format cell properties but it still appears as 01/01/1980. I have to goto individual cell and press F2 <enter> so see the effect. Dont know why? I cant even copy paste format after that .... TIA/amag I am not sure, but is your workbook set to Auto-Recalculate? Try pushing <F9> to do a manual re-calculation, see if that changes the formats. If it does, go to Tools (on the menu bar), Options, Ca...

Free Trial Issue
Hello, I just downloaded the Publisher 2007 free trial, recieved the email with the trial key, and was able to open the program. However, when I try to start a New project nothing will open...I keep getting the response ' Publisher cannot complete the operation'. What can I be doing wrong? Thanks! Did you activate the trial? Do you have a default printer selected? Try opening Publisher as the administrator. -- Mary Sauer http://msauer.mvps.org/ "michele411" <michele411@discussions.microsoft.com> wrote in message news:BCE8D514-B734-4E0C-929C-A6D4BB32D813@micros...

How to sort by name then date?
I would like to look through all the emails to a particular person. If I click on the "To" column I can see all the emails to a particular person (actually there is a problem with that which I will mention next) but they seem to be in random order. Is there a way to have them sorted by date? (i.e. by name first, then by date). Actually, sorting on the "To" column does not get all the emails sent to a given email address. Because Outlook uses the "display as" field. It will often give different "display as" names to the same email address. C...

Concatenate including a date so that the date appears as a date
When I try to join the contents of several cells, one of which is a date and time obtained from =now(), the date and time part appears as a number. How can I make it appear as a date and time? I have tried changing the cell formats - probably there is a combination that works but I haven't found it. I also tried copying the original date cell to another cell and changing the latter cell's format and concatenating using that latter cell, but still no success. Use the TEXT function. For example, =TEXT(NOW(),"mmmm d, yyyy") would give January 6, 2010 "dd...

printing error handling issue? (when clicking cancel get 2501 error)
I have a report that when it is closed the DoCmd RunCommand acCmdPrint occurs ... but of course if the user clicks cancel, it gives me a 2501 error. How & where do I put code to surpress this error. I would just the close even to run the DoCmd RunCommand acCmdPrint and if cancel is selected just continue to close the report? TIA, _Bigred I understand that I have to do this, I actually don't understand HOW to do it, and where to put code to accomplish this?? 1) What code do I use? 2) Where do I put the code? Thanks, _Bigred "Duane Hookom" <duanehookom@NO_...

if statement with dates #2
I would like to have a statement like: IF(a1>0,1/1/2004) with 1/1/2004 beint a date. EXCEL is interpreting 1/1/2004 as an arithmetic statement and giving me the result of the arithemtic. I could put in the numeric offste for the date and write IF(a1>0,37987), formatting the cell as a date, but this seems awkward. What else can I do? TIA, Sanford ...

Counting Dates?
=COUNTIF(A1:A100,"<" & NOW()) This works good for specific cells. I have a similar question. How would I do the same thing given that: 1) You only have a starting date 2) Your only wanting to count work days (in this case 4 day/wk) up to NOW() Thank you for all your help. Aviator On Thu, 6 Jan 2005 12:53:03 -0800, "Aviator" <Aviator@discussions.microsoft.com> wrote: >=COUNTIF(A1:A100,"<" & NOW()) > >This works good for specific cells. I have a similar question. > >How would I do the same thing given that: >1) You only ha...

Count Unique Cells, within a date range (dates stored in separate column).
Hello All: I am attempting to create a formula that will count the number of unique cells (alpha-numeric) in an entire column (no set length, so ex: "$B:$B"). This count will be based on a date range (Between 2 dates). The dates are stored in another column (Ex: "$A:$A"). The following is an example of the cells. Dates PO_Num 1/2/2010 A123456 1/3/2010 B453453 2/2/2010 A123456 3/4/2010 C2342F3K 4/3/2010 123456 I would like to know a formula that can count the number of different PO's based on a given date range. Please help me if you...

An expression for dates from and to
I am trying to create an expression to select items from a date field falling from a certain date to a certain date. I am obviously missing something in my expression. The field name is DateComplete. How can I set up this expression to pull date from a certain date to a certain date? -- Ronnie Hi Ronnie, An example of the SQL would be: SELECT * FROM [TABLE NAME] WHERE DateComplete Between #1/1/2006# And #1/1/2007# ; On May 23, 3:52 pm, Ronnie <Ron...@discussions.microsoft.com> wrote: > I am trying to create an expression to select items from a date field falling > from a...

Returning only MAX(date) not all dates
I want to be able to list the most current date an item is checked out. As I was working through the query I used max as an aggregate function but I still can't get the simple result I want. I'd rather list the fields I have chosen and somehow select just the most current checkout date. Any help would be greatly appreciated. Here is my query: SELECT tblTerritory.TerritoryID, [TerritoryName] & " " & [TerritoryDescription] AS Description, tblTerritory.TerritoryTypeID, tblTerritoryType.TerritoryType, Max(tblTerritoryCheckout.DateCheckedOut) AS Checked...

How do you calculate interest expense on bonds?
Using Excel office on XP. Issued $1mill of 11% 20 year bonds, issued 4-1-04 and paying interest on a yearly bases on 3-31. Need to calculate interest expense for fiscal year ended 9-30-04 assuming a premium of $80,000 amoritized on a streight line bases. Hi, Try having a look at the =PRICE function in help. If this isn't exactly what you need then it should point you in the right direction. HTH, David Jessop "Sprout" wrote: > Using Excel office on XP. Issued $1mill of 11% 20 year bonds, issued 4-1-04 > and paying interest on a yearly bases on 3-31. Need to ...

System Date
Can anyone help me on how to force the system date to a member field of "Date" type? I could not find any help on msdn that comes with visual c++. Any hint or help will be appreciated. Thanks, Behrouzk Are you just trying to get the current date. You can use CTime::GetCurrentTime() or COleDateTime::GetCurrentTime() Tom "Behrouzk" <Behrouzk@discussions.microsoft.com> wrote in message news:D8FA4B6B-73CE-4058-B50C-C9BEBAB67E68@microsoft.com... > Can anyone help me on how to force the system date to a member field of > "Date" type? I could not fi...

How is your intrect calculated on this loan
I am setting up my Mortgage loan on MS-Money 2003 and this question has come up with only three options. My interest in calculated on the 1st of every month not any of these options. Is there any way I can do this as all my figures keep calculating wrong using the options given. "Based on date payment is due" should work for you, unless the due date is different than the first of the month. -- Will you sponsor me in the Tour de Cure? http://main.diabetes.org/site/TR?pg=personal&fr_id=1058&px=1626087 "Charles" <cennor@optusnet.com.au> wrote in message ...

Conditional Formatting
Hi, I have a spreadsheet that is for tracking work. I would like to have conditional formatting so that if the date in column E is between todays date and 4 weeks away then make it blue, if it is a date that is after 4 weeks away then make it yellow but if it is in the past make it red. Can this be done with conditional formatting or does it need vba? Also it would be nice if the whole row changes colour even if just the condition is on the date which is in column E - but if that can't be done then just the cell is fine. Thanks Assume the dates start in E2, select all dates w...

Time and date problem
Hello I have spreadsheet cell (B1) that contains a date and time: 05/11/2003 13:45:50 I have another series of cells (A1 to A100) that contain an increment of 30 seconds: 30.00 I would like to add the seconds to the date and time putting the result in column C, I have tried to do: =B1+(A1/100000) but the answer is wrong by 4 seconds and then gets worse the further down the column I go. Can somebody show me how to add the seconds to the date please. Thanks Tom Tom, Right method, wrong divider! 86,400 secs in a day.. change your 100000 to 86400 and you're there. Nikos Y. (nyannaco ...